This contract is for the excavation of the Baywood Stormwater Detention Basin for the Harris County Flood Control District. The project involves the construction of a stormwater detention basin to reduce the impact of street flooding in the Almeda-Genoa Road corridor. The contract was awarded to A Morfin Trucking LLC, with a construction price of $1,046,292 and an owner contingency of $100,000. The project is expected to be completed within 365 days. Key aspects of the contract include:
• Excavation of the Baywood Stormwater Detention Basin
• Construction of a stormwater detention basin
• Reduction of street flooding in the Almeda-Genoa Road corridor
• Construction price of $1,046,292
• Owner contingency of $100,000
• Project duration of 365 days