The 2018 Roller Compacted Concrete Pavement Project involves the construction of roller compacted concrete pavement at multiple locations, including Washington Boulevard, Atkinson Street, Denio Loop, and Church Street. The project also includes other work such as portland cement concrete pavement, hot mix asphalt, concrete curb and gutter, aggregate base, cement treated base, roadway excavation, diamond grind concrete pavement, traffic striping, traffic signal modification, ADA ramps, and Best Management Practices (BMPs). The bid deadline was April 16, 2018, and the apparent low bidder was FBD Vanguard Construction, Inc. with a total bid of $7,940,245.00. Key features of the project include:
• Construction of roller compacted concrete pavement at multiple locations
• Other work such as portland cement concrete pavement, hot mix asphalt, and concrete curb and gutter
• Bid deadline was April 16, 2018
• Apparent low bidder was FBD Vanguard Construction, Inc. with a total bid of $7,940,245.00