This is a public‑works, stipulated‑price construction contract for the reconstruction of the Central Avenue and 48th Street West intersection in Billings, MT. The scope includes widening four approach legs, replacing irrigation‑ditch culverts, relocating multiple private utilities, demolishing existing pavement, installing new sub‑base and asphalt surfaces, providing new curbs, fencing, and extensive traffic‑signal and electrical work (including LED luminaires, signal controllers, and video‑detection systems). The contract period is 80 calendar days with a maximum of 50 days of full road closure, and liquidated damages are imposed for late performance. Bids were due February 23 2026, with a virtual bid opening on February 24 2026. The project is funded by Yellowstone County and must comply with Montana Public Works Standard Specifications, prevailing‑wage requirements, and environmental permits.
• Roadway widening (≈ 2,180 ft total) and new pavement/curb construction
• Utility coordination and irrigation‑culvert replacement
• Full traffic‑signal installation (poles, conduit, controllers, LED fixtures)
• Strict schedule (80‑day contract, 50‑day full‑closure limit) and liquidated‑damage provisions.