This municipal contract awards SRM Concrete the sole responsibility for supplying concrete and flowable fill to the City of Dothan’s Public Works Department for a one‑year period, with optional extensions for two additional years. The work includes delivering ready‑mix concrete (various strengths) and flowable fill to multiple job sites within a short radius, subject to minimum load requirements and assorted surcharge fees.
• Scope: Provide concrete (3000 lb and 4000 lb mixes) and flowable fill for curb, gutter, sidewalk, and storm‑drain projects.
• Delivery: Minimum 3 cubic yards per trip to 2‑5 locations within 2 mi of each job site; includes environmental and fuel surcharges.
• Pricing: Unit‑price schedule (e.g., concrete $162‑$200 per CY; flowable fill $146‑$175 per CY) plus fixed fees ($67/load environmental, $40‑$55 fuel).
• Terms: One‑year base period, with optional two‑year extensions pending mutual agreement; sealed bids only, no late or electronic submissions accepted.