The Summit County Board of Elections Parking Lot Improvement Project involves the improvement of the parking lot at the Board of Elections Early Voting Building located at 500 Grant St., Akron. The project includes revising the entrance and exit drives to the facility, overlaying the existing asphalt parking lot, and building a set of exterior concrete stairs and retaining wall between parking lots. The engineer's estimated cost of the project is $175,000.00. The project is expected to be completed within a certain timeframe, but the exact duration is not specified. The contract was awarded to Perrin Asphalt Company.
• The project involves parking lot improvement at the Board of Elections Early Voting Building.
• The project includes revising the entrance and exit drives, overlaying the existing asphalt parking lot, and building a set of exterior concrete stairs and retaining wall.
• The engineer's estimated cost of the project is $175,000.00.
• The contract was awarded to Perrin Asphalt Company.
• The project is expected to be completed within a certain timeframe, but the exact duration is not specified.