This contract is a City of Spokane RFQ for the fabrication and delivery of a hopper cone and associated SDA hopper cone rings to the Wastewater Treatment Facility. The items must be supplied per engineering drawings, include freight transportation, and be delivered by April 30 2021. The solicitation was awarded to Krueger Sheet Metal, with unit pricing provided for each component and freight.
• Scope: Manufacture and ship one hopper cone and one set of SDA hopper cone rings (metal components) plus estimated freight.
• Financials: Unit prices listed at $4,827.45 (cone) and $2,907.44 (rings); total pre‑tax estimate between $6,020.76 and $6,556.61.
• Timeline: Awarded 8 Feb 2021; delivery required by 30 Apr 2021.