The contract is for Pioneer Home Exterior Site Repairs, which includes removal and replacement of site concrete flatwork, installation of trench drains, reconstructing brickwork, construction of ADA ramps, and asphalt pavement replacement. The contract was awarded to Diamond Point Const. from Buffalo, WY, with a base bid of $143,095.85. The scope of work includes various schedules, such as Schedule 1, Schedule 2, Schedule 3, Schedule 4, and Schedule 5. The contract was posted on April 6, 2017, and the bid submission date was April 20, 2017.
• The contract includes a mandatory pre-bid walk-through.
• The contractor must upload their bid response documents to the Public Purchase site.
• The contractor is responsible for viewing bid documents for any possible revisions or updates.
• The contract has a 10% bid bond requirement.
• The contractor must sign the attendance sheet prior to the commencement of the pre-bid meeting.