This contract involves the wet demolition of existing structures at 559 Hickory Street, Mobile, AL, including removal of footings, slabs, and CMU/brick piers, with strict lead‑based paint and asbestos controls. The contractor must cap and disconnect all utilities, provide extensive erosion‑ and sediment‑control BMPs, and complete all site stabilization work within a 30‑day window after receiving a notice to proceed. The awardee must also submit comprehensive close‑out documentation, including waste shipment records, photographs, affidavits, insurance certificates, and a published notice of final completion.
• Wet demolition to control dust and hazardous material exposure
• Mandatory utility capping, lead‑paint/asbestos disposal, and permanent site stabilization
• Tight schedule (30 calendar days) with liquidated damages of $250 per day after a 15‑day grace period
• Extensive documentation and compliance requirements (E‑Verify, erosion‑control training, permits, insurance)