The 2016 Bike Trail Resurfacing Project involves resurfacing segments of bike trails throughout the City of Roseville. The project includes striping and vegetation removal, bollard removal, Type I slurry seal, permanent paint striping, bollard installation, traffic control, and sweeping. The engineer's estimate for the project is $207,500. The contract was awarded to two vendors: Telfer Pavement Technologies, LLC and Sierra Nevada Construction, Inc. Key aspects of the project include:
• Resurfacing of bike trails
• Striping and vegetation removal
• Bollard removal and installation
• Traffic control and sweeping
• Engineer's estimate of $207,500
• Awarded to two vendors: Telfer Pavement Technologies, LLC and Sierra Nevada Construction, Inc.