This contract awards the demolition and site‑remediation of a damaged structure at 310 Rylands Street, Mobile, Alabama. The contractor must perform wet demolition of all wood‑frame and masonry elements, cap and disconnect utilities, install temporary erosion‑control BMPs, handle lead‑based paint and asbestos in accordance with federal and state regulations, and restore the site with topsoil, seeding, and mulching. The work must be completed within 30 calendar days of the Notice to Proceed, with daily liquidated‑damages of $250 for any delay beyond the 15‑day grace period after substantial completion. The contract is a stipulated‑sum, low‑bid award and requires the vendor to provide E‑Verify enrollment, insurance certificates, and various AIA close‑out documents.
• Wet demolition and full removal of structures, utilities, and debris.
• Mandatory erosion‑control, lead‑paint, and asbestos handling with disposal to permitted landfills.
• Completion deadline of 30 days plus penalties for late performance, and final notice publication requirements.