The Montana Department of Transportation (MDT) is accepting bids for the Overlay and Chip Seal Frontage Road Rocker to W of Ramsay-Nissler Road Butte Area project. The project involves overlay and chip seal work on the frontage road. The contract requires the contractor to perform the work in accordance with the specifications and requirements outlined in the contract documents. Some of the key requirements include:
* The contractor must be registered with the Department of Labor and Industry under sections 39-9-201 and 39-9-204, MCA, prior to contract execution.
* The contractor must comply with the prevailing wage requirements, including paying the standard prevailing rate of wages to workers performing the contract.
* The contractor must also comply with the fringe benefits, travel allowances, and per diem requirements outlined in the contract.
* The contract includes a provision for a 3% increase in the standard prevailing rate of wages every 12 months for multi-year contracts.
The contract also includes various product line items, such as mobilization, 3/4" commercial plant mix grade S PG 64-28, test trailer, transport and setup, W beam guardrail, and cold milling. The contract has a bid posting date of 8/28/2025 and a bid submission date of 9/18/2025.
Some key points to consider:
* The contractor must submit a bid that includes all the required documentation and information.
* The contractor must comply with all the requirements and specifications outlined in the contract.
* The contract includes a provision for a 3% increase in the standard prevailing rate of wages every 12 months for multi-year contracts.
* The contractor must also comply with the fringe benefits, travel allowances, and per diem requirements outlined in the contract.