This contract involves the complete demolition (wet method) of existing structures at 1328 Adams Street, Mobile, AL, including removal of footings, slabs, and underground utilities, followed by comprehensive site remediation and restoration. The contractor must manage hazardous waste (lead‑based paint, asbestos), provide erosion and sediment control measures, dispose of all debris in compliant landfills, and complete final site grading, seeding, and mulching. The City requires proof of E‑Verify enrollment, a current business license, insurance, and a series of close‑out documents (affidavits, payment applications, lien releases, and final notice publication).
• Perform wet demolition and utility cap‑off to city standards.
• Handle, transport, and document disposal of LBP/ACM waste per federal and state regulations.
• Install temporary and permanent erosion‑control BMPs, then restore the site with topsoil, seed, and mulch.