The contract is for the excavation of the Inwood Forest Stormwater Detention Basin for the Harris County Flood Control District. The project aims to provide flood damage reduction and mitigation benefits to Harris County residents. The contract was awarded to Allgood Construction Company Inc. for $70,675,829. The project involves the excavation of the detention basin, as well as the installation of various infrastructure components, including pipes, manholes, and concrete boxes. The contract also includes provisions for traffic control, construction fencing, and tree root pruning. The project is expected to provide 1,274 acre-feet of detention volume, which will be equally shared by the City and the District.
• The contract includes a detailed breakdown of the estimated costs for each component of the project.
• The project is a joint effort between the Harris County Flood Control District and the City of Houston.
• The contract includes provisions for MWDBE participation, with a goal of 28% participation.
• The project is expected to provide significant flood damage reduction benefits to Harris County residents.
• The contract includes a comprehensive scope of work, including excavation, piping, and infrastructure installation.
• The project is subject to various regulations and requirements, including those related to environmental protection and traffic control.