Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Pennsylvania guidePennsylvania Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More architecture bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Pennsylvania
  4. ›Architecture
  5. ›College of Engineering - New West 1 Building & New West 2…

Awarded contract·Pennsylvania State University-Main Campus·Pennsylvania

College of Engineering - New West 1 Building & New West 2 Building

Won by Payette$18MAwarded 2/22/2019Single Award
Contract source

Awarded vendors

  • Payette

Description

The Pennsylvania State University’s College of Engineering selected an architect‑engineer team to design two new campus buildings (West 1 and West 2). The scope includes full A/E services—schematic design, design development, construction documents, and construction administration—under the university’s standard 1‑P agreement, with coordination to a single Construction Manager and compliance with high‑performance (LEED) standards. Payette was awarded the contract on February 22 2019 after a competitive qualification‑based process that involved a request for letters of interest, an RFP, short‑listing, and in‑person interviews. The projects together represent a combined construction cost of roughly $312 million, indicating a substantial design‑services effort. • Full‑service A/E design for two new research and teaching facilities (≈ 279 k GSF and ≈ 98 k GSF). • Requirements include LEED certification, coordination with a new parking‑garage design‑build, and delivery through a multiple‑prime contract model. • Selection was competitive, with multiple firms short‑listed before Payette’s award.

Attached files

Key dates

Bids closed
4/3/2024
Intent to award
2/22/2019
Awarded
2/22/2019
Starts
2/22/2019

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Architecture
NAICS
541310

Contract value

$18,000,000

The combined construction cost for West 1 and West 2 is reported as roughly $229 M and $83 M respectively, totaling about $312 M. Architectural design contracts for projects of this scale typically range from 4 % to 8 % of construction cost, depending on complexity, scope, and risk allocation. Using a mid‑range estimate of 5.5 % yields an approximate design‑services value of $17.2 million. Accounting for additional coordination with the construction manager and the high‑performance (LEED) requirements could push the fee slightly higher, so a reasonable ball‑park estimate is between $15 M and $20 M, with $18 M as a central figure.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Wyoming State Construction Department·Wyoming

Top match · 65%

Design/Engineering Services for Western Wyoming Community College Powerline Technology Facility - Rock Springs, WY

Closes 11/3/2026Opened 9/24/2026

North Carolina Robeson Community College·North Carolina

63% match

Health Care Education Building- New Construction

Closes 12/8/2026Opened 8/31/2026

York Technical College·South Carolina

63% match

YTC - Welding Expansion - Building D **READVERTISEMENT - Documents May Be Obtained From Location**

Closes 11/12/2026Opened 10/14/2026

Northern Virginia Community College·Virginia

63% match

260-B5260-007 CM Engineering Lab & Pantry

Closes 11/9/2026Opened 10/6/2026

State Center Community College District·California

63% match

Progressive Design-Build Services, West Fresno Interdisciplinary Classroom & Cafe, FCC

Closes 11/17/2026Opened 7/15/2026

The University of North Carolina·North Carolina

62% match

New Residence Hall 1 - Full Building Round 2

Closes 11/12/2026Opened 10/13/2026

CUNY Baruch College·New York

62% match

CUNY Baruch College South Campus Boilers and Asbestos Abatement

Closes 11/3/2026Opened 10/7/2026

York Technical College·South Carolina

61% match

YTC - Welding Expansion - Building D

Closes 11/12/2026Opened 10/9/2026

The University of North Carolina·North Carolina

61% match

New Residence Hall 1 - Full Building Round 2-Revised

Closes 11/12/2026Opened 10/13/2026

Dormitory Authority of the State of New York (DASNY)·New York

61% match

MWBE & SDVOB Opportunities - Baruch College South Campus Boilers and Asbestos Abatement, Baruch College

Closes 11/2/2026Opened 10/5/2026

The University of North Carolina·North Carolina

61% match

Roof Repairs Phase 3 – College of Veterinary Medicine Main Building

Closes 11/17/2026Opened 8/18/2026

Fox Valley Technical College·Wisconsin

61% match

Building Envelope – Main Campus

Closes 11/16/2026Opened 10/19/2026

Parks Recreation & Historic Preservation, NYS Office of·New York

61% match

Shower Building Addition NYS Park Police Training Academy

Closes 11/5/2026Opened 9/30/2026

Parks Recreation & Historic Preservation, NYS Office of·New York

61% match

Rockwood Hall Entrance at Rockwood Hall of Rockefeller State Park Preserve

Closes 11/19/2026Opened 10/15/2026

U.S. Department Of Energy·California

60% match

Y--COTP Series Capacitor Two-Phase Design Build

Closes 11/13/2026Opened 10/20/2026

Grayson College·Texas

60% match

Grayson College - New Maintenance Facility & Existing Health Science Renovations

Closes 11/5/2026Opened 10/9/2026

Tri-County Technical College·South Carolina

60% match

TCTC - HVAC Program at Oconee Campus

Closes 11/5/2026Opened 9/25/2026

Connecticut Town of Monroe·Connecticut

60% match

Architectural & Engineering Design Services New School Building-Chalk Hill

Closes 11/4/2026Opened 10/21/2026

Horry Georgetown Technical College·South Carolina

60% match

Grand Strand Dental Building Boiler Replacement

Closes 11/16/2026Opened 10/27/2026

Northeast Wisconsin Technical College·Wisconsin

60% match

DO_CO and AG_SC Comp

Closes 11/24/2026Opened 10/28/2026

The University of North Carolina·North Carolina

60% match

Residence Hall Renovations - Beall and Bryan

Closes 11/17/2026Opened 10/26/2026

North Orange County Community College District·California

60% match

BUILDING 100 ELEVATOR TOWER AT FULLERTON COLLEGE

Closes 11/5/2026Opened 10/16/2026

Fox Valley Technical College·Wisconsin

60% match

Electrical Engineering Updates

Closes 11/12/2026Opened 10/28/2026

City of Key West·Florida

60% match

Bayview Park Phase 2

Closes 11/9/2026Opened 9/24/2026

The University of North Carolina·North Carolina

60% match

Academic Commons Phase 2 - Building Addition

Closes 11/17/2026Opened 10/26/2026