The City of Rapid City is seeking a vendor to replace the submersible pump equipment in Well #9 off of Arrowhead Dr. The project has an engineer's estimate of $270,000.00, and the awarded bid was $477,846.00 by Layne. The project includes the removal and replacement of the pump equipment. The bid results and other project documents are available for download.
• The project is located in Rapid City, South Dakota.
• The engineer's estimate for the project is $270,000.00.
• The awarded bid was $477,846.00 by Layne.
• The project includes the removal and replacement of the pump equipment.
• The bid results and other project documents are available for download.