This contract calls for the wet demolition of a metal storage building located at 4241 Furman Drive, Mobile, AL 36619, including removal of footings, slabs, and related structures, cap‑off of all utility lines, full debris removal, and comprehensive erosion‑control and hazardous‑material (lead‑based paint and asbestos) compliance. The contractor must complete the work within 15 calendar days of receiving a Notice to Proceed and is subject to a $250 per day penalty for any work remaining beyond that period. Pre‑contract documentation (E‑Verify proof, insurance, AIA forms, etc.) must be submitted within two days of award, and close‑out documentation (liens releases, final photographs, waste‑shipment records) is required before final payment. No contract ceiling is disclosed; pricing is to be submitted as a lump‑sum total quote.
• Wet demolition with BMPs for lead‑paint and asbestos
• Utility cap‑off, debris staging, and site stabilization
• Strict 15‑day performance window with daily late‑completion penalties
• Mandatory pre‑contract and close‑out documentation (E‑Verify, insurance, AIA G702/G703, G706, G706A)
• No set‑aside or small‑business requirements noted