This municipal contract calls for a comprehensive replacement of concrete sidewalks across the City of Waukesha. The scope includes removal and replacement of 4‑inch and 6‑inch concrete sidewalks, a 6‑inch concrete drive approach, concrete curb and gutter work, and the installation of a detectable warning field. Three primary contractors submitted unit‑price bids for every line item, allowing a clear cost comparison. The total bid amounts range from roughly $361K to $419K, indicating a medium‑size infrastructure project. No award information is provided, so the eventual contract winner remains undetermined.
• 4‑inch sidewalk: 28,700 sq ft @ $10.85–$12.66 per sq ft
• 6‑inch sidewalk & drive: 2,500 sq ft @ $11.00–$13.33 per sq ft
• Curb & gutter: 300 lin ft @ $58.00–$70.69 per lin ft
• Detectable warning field: 20 sq ft @ $44.89–$50.00 per sq ft