The contract is for the 112th Ave Ne Corridor Improvements project, which involves various construction activities such as removing trees, asphalt pavement, and cement concrete traffic curb, as well as installing new traffic signal systems, conduits, and junction boxes. The project also includes property restoration and miscellaneous work. The engineers' estimate for the project is between $2.7 and $3.0 million. The contract was awarded to multiple vendors, with the lowest bid being $2,351,556.30. The project is expected to be completed within a certain timeframe, although the exact duration is not specified. The contract includes various line items, such as construction survey, mobilization, traffic control, and pavement repair, with corresponding unit prices and quantities.
• The project involves multiple construction activities, including removal and installation of various infrastructure elements.
• The engineers' estimate for the project is between $2.7 and $3.0 million.
• The contract was awarded to multiple vendors, with the lowest bid being $2,351,556.30.
• The project includes various line items, such as construction survey, mobilization, traffic control, and pavement repair.
• The contract includes provisions for property restoration and miscellaneous work.