Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›Concrete Sidewalk, Driveways, Curb Ramps, Curb & Gutter…

Awarded contract·Seminole County·Florida

Concrete Sidewalk, Driveways, Curb Ramps, Curb & Gutter and Traffic Separators Construction and Repairs

Won by Huffman Inc. DBA NuWave Concrete$15MSingle Award
Contract source

Awarded vendors

  • Huffman Inc. DBA NuWave Concrete

Description

This contract is for the construction and repair of concrete sidewalks, driveways, curb ramps, curb and gutter, and traffic separators in Seminole County, Florida. The contract was awarded to Huffman Inc. DBA NuWave Concrete and has a duration of 6 years, with the option for renewal. The contract value is not explicitly stated, but it is likely to be a significant amount given the scope of the project. The key aspects of this contract include the construction and repair of various infrastructure elements, the use of a term contract, and the potential for renewal. • The contract is for a term of 6 years, with the option for renewal. • The contract is for the construction and repair of concrete sidewalks, driveways, curb ramps, curb and gutter, and traffic separators. • The contract was awarded to Huffman Inc. DBA NuWave Concrete. • The contract value is not explicitly stated. • The contract is a term contract, with work to be performed on an as-needed basis.

Attached files

Key dates

Starts
8/16/2016
Ends
8/15/2022Renews
Duration
6 years

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
IFB-602510-16/GCM

Contract value

$15,000,000

The contract value is not explicitly stated in the provided documents. However, based on the scope of the project, which includes the construction and repair of concrete sidewalks, driveways, curb ramps, curb and gutter, and traffic separators, it is likely to be a significant amount. Considering the duration of the contract (6 years) and the fact that it is a term contract with work to be performed on an as-needed basis, the contract value could be in the range of $1 million to $5 million per year, depending on the frequency and scope of the work orders. Therefore, the total contract value could be estimated to be around $6 million to $30 million over the 6-year period.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Mobile·Alabama

Top match · 78%

Residential Sidewalk Repair Program

Closes 11/6/2026Opened 10/22/2026

City of Salinas·California

78% match

2026 Citywide Sidewalk Repair Project

Closes 11/23/2026Opened 10/23/2026

City of Vista·California

78% match

As-Needed Concrete Construction (CIP No. 8290)

Closes 11/25/2026Opened 10/22/2026

City of Dayton·Ohio

78% match

Patterson Boulevard Rehabilitation

Closes 11/12/2026Opened 10/29/2026

City of Irving·Texas

77% match

Annual Concrete Contract - Repair of Sidewalk and Streets Using Allocated Funding From the Dart General Mobility Program.

Closes 11/6/2026Opened 10/20/2026

City of Fort Wayne·Indiana

77% match

0963C - Five Points Neighborhood Concrete Repairs

Closes 11/12/2026Opened 10/29/2026

San Bernardino County·California

77% match

Randall Avenue Sidewalk

Closes 12/3/2026Opened 10/27/2026

Maryland Baltimore City Department of Transportation·Maryland

77% match

TR-27003 RECONSTRUCTION OF FOOTWAYS CITY WIDE

Closes 11/18/2026Opened 10/24/2026

Nyc Department of Design and Construction·New York

77% match

85027B0026 - HWCB27KR : REPLACEMENT OF CONCRETE, STEEL FACED AND GRANITE CURBS AND RELATED SIDEWALK AND ROADWAY RESTORATION

Closes 11/23/2026Opened 10/30/2026

Maryland Baltimore City Department of Transportation·Maryland

76% match

TR27002 Reconstruction of Footways Citywide

Closes 11/18/2026Opened 10/24/2026

Maryland Baltimore City Department of Transportation·Maryland

76% match

TR27001 -Reconstruction of Footways Citywide

Closes 11/17/2026Opened 10/23/2026

City of Ontario·California

76% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

City of Riverside·California

76% match

Stover Avenue Sidewalk Improvements (Fury Drive to Eagle Rock Drive)

Closes 11/9/2026Opened 10/8/2026

Los Angeles County Public Works·California

76% match

RMDJOC6790 Parkway Concrete Maintenance, MD 2

Closes 11/10/2026Opened 10/13/2026

City of Vernon·California

76% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

City of Cerritos·California

76% match

CDBG-Funded curb ramp/sidewalk repairs at Cerritos Towne Center Phase IV (CDBG Project No. 602800-26), Project No. 24302

Closes 11/18/2026Opened 10/23/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

76% match

CORA DRIVE SIDEWALK IMPROVEMENTS PROJECT CITY-PARISH PROJECT No. 24-EN-HC-0025

Closes 11/17/2026Opened 10/16/2026

City of Portland·Maine

76% match

2026 Forest Avenue Sidewalk Project (PDF, 88.12 KB)

Closes 11/4/2026Opened 10/9/2026

Nyc Department of Design and Construction·New York

76% match

85027B0025 - HWCB27QXM: REPLACEMENT OF CONCRETE, STEEL FACED AND GRANITE CURBS AND RELATED SIDEWALK AND ROADWAY RESTORATION

Closes 11/23/2026Opened 10/30/2026

San Bernardino County·California

75% match

North San Bernardino ADA Ramps

Closes 11/19/2026Opened 10/21/2026

City of Culver City·California

75% match

Minor Pavement & Concrete Improvement Project (PZ-554) and Ocean Drive Sidewalk Project (PS-037)

Closes 11/19/2026Opened 10/29/2026

Maryland Baltimore City Department of Transportation·Maryland

75% match

TR-26006 RECONSTRUCTION OF FOOTWAYS CITY WIDE

Closes 11/18/2026Opened 10/24/2026

Illinois Tollway·Illinois

75% match

RR-26-2066 - Roadway & Bridge Rehabilitation & Plaza Improvements

Closes 12/3/2026Opened 10/26/2026

New York City Department of Design and Construction·New York

75% match

HWCB27KR: REPLACEMENT OF CONCRETE, STEEL FACED AND GRANITE CURBS AND RELATED SIDEWALK AND ROADWAY RESTORATION

Closes 11/23/2026Opened 10/30/2026