Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›LEVEE ENCROACHMENT REMOVAL AND RESTORATION PROJECT

Awarded contract·County of Sacramento - Construction·California

LEVEE ENCROACHMENT REMOVAL AND RESTORATION PROJECT

Won by Ariza Construction, Inc.$95kSingle Award
Contract source

Awarded vendors

  • Ariza Construction, Inc.

Description

The contract is for the removal and restoration of a levee encroachment, including the demolition of a residential home and garage structure with lead and asbestos containing material, and the reconstruction of the levee section. The contract was awarded to Ariza Construction, Inc. for a total bid of $94,969.00. The project requires a General Engineering Contractor or General Building Contractor license, and a §7058.5 asbestos certification or a C-22 Asbestos Abatement Classification. • The contract involves the demolition of a residential home and garage structure with lead and asbestos containing material. • The reconstruction of the levee section is also included in the contract. • The contract requires a General Engineering Contractor or General Building Contractor license. • A §7058.5 asbestos certification or a C-22 Asbestos Abatement Classification is also required. • The contract was awarded to Ariza Construction, Inc. for a total bid of $94,969.00.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237990
Solicitation №
40903

Contract value

$94,969

The contract value can be estimated based on the total bid of $94,969.00. This amount is likely to be the contract value, as it is the lowest bid and the contract was awarded to Ariza Construction, Inc. for this amount.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

U.S. Department Of Defense·Missouri

Top match · 76%

Corning and Holt 10 Levee Repairs

Closes 7/21/2027Opened 7/21/2026

U.S. Department Of Defense·Missouri

75% match

Levee Repair at MRLS L246

Closes 5/28/2027Opened 5/28/2026

U.S. Department Of Defense·Missouri

75% match

Levee Repairs at Saline County Levee District #2, Ray-Carroll Bottoms Consolidated Levee District of Carroll County, and Howard County Levee District #4

Closes 2/5/2027Opened 11/26/2025

U.S. Department Of Defense·Missouri

74% match

Missouri Valley Levee Repairs

Closes 1/20/2027Opened 1/20/2026

Municipality of Skagway·Alaska

74% match

West Creek Levee Improvements

Closes 11/9/2026Opened 10/12/2026

U.S. Department Of Defense·Arkansas

72% match

St Francis Town Levee Renovation

Closes 11/23/2026Opened 10/22/2026

City of Cedar Rapids·Iowa

72% match

Ellis Blvd NW Levee and Floodwall Improvements

Closes 11/18/2026Opened 10/21/2026

East Bay Municipal Utility District·California

72% match

Mokelumne River Floodplain Habitat Restoration Project

Closes 11/6/2026Opened 9/21/2026

U.S. Department Of Defense·Louisiana

72% match

CONCORDIA PARISH, LOUISIANA; FC/MR and T, WBMRL; LEVEE, ENLARGEMENT AND BERMS; UPPER LAKE CONCORDIA - VIDALIA, ITEM 367-R

Closes 11/13/2026Opened 10/19/2026

U.S. Department Of Defense·Michigan

72% match

Sebewaing River South Levee Repairs

Closes 1/23/2027Opened 11/17/2025

City of Creve Coeur·Missouri

71% match

Malcolm Terrace Park Bridge and Deer Creek Stabilization

Closes 11/12/2026Opened 10/22/2026

Massachusetts Town of Bolton·Massachusetts

71% match

Earthen Dam Restoration at Bowers Spring Conservation Area

Closes 11/17/2026Opened 10/13/2026

U.S. Natural Resources Conservation Service·United States of America

71% match

Easement Restoration and Stewardship

Closes 11/19/2026Opened 9/25/2026

City of Shawnee·Kansas

70% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

U.S. Dept. of Treasury RESTORE Act Program·United States of America

70% match

RESTORE Act Direct Component ? Construction and Real Property Acquisition Activities

Closes 10/31/2026Opened 9/26/2024

City of El Cajon·California

70% match

BROADWAY CREEK RESTORATION - PHASE B

Closes 11/16/2026Opened 10/14/2026

City of Charlotte·North Carolina

70% match

Newell Stream Restoration Project

Rolling / TBD closeOpened 7/15/2026

City of Madison·Wisconsin

70% match

Castle Creek Channel Improvements at Warner Park

Closes 11/5/2026Opened 10/23/2026

City of Keene·New Hampshire

70% match

Ashuelot Rail Trail Bridge (KSC) Rehab

Closes 11/24/2026Opened 10/21/2026

U.S. Department Of Defense·Illinois

70% match

DUTCH GAP AQUATIC ECOSYSTEM RESTORATION, ANTIOCH, LAKE COUNTY, ILLINOIS

Closes 8/8/2028Opened 8/12/2025

North Lafourche Conservation, Levee and Drainage District·Louisiana

70% match

Reach 1 Site Preparation Project - Morganza To the Gulf Risk Reduction System

Closes 12/3/2026Opened 10/29/2026

Town of Church Point·Louisiana

69% match

CHURCH POINT DETENTION AND FLOOD PROOFING PHASE 2 FOR THE LOUISIANA WATERSHED INITIATIVE

Closes 11/10/2026Opened 10/14/2026

City of Carver·Minnesota

69% match

Carver, City of Certified Levee Improvements Rebid BMI No. 0C1.123664

Closes 11/12/2026Opened 10/21/2026

Manatee County - Purchasing Division·Florida

69% match

MUSGRAVE RANCH ROAD FLOODPLAIN COMPENSATION

Closes 11/20/2026Opened 10/15/2026

U.S. Department Of Defense·Louisiana

69% match

Calcasieu River and Pass, LA, Maintenance Dredging FY26, Mile 5.0 to Mile 17.0, Calcasieu and Cameron Parishes, LA

Closes 6/12/2028Opened 5/28/2026