This opportunity concerns the complete redesign and signalization of the Main Street–Saco Island intersection in Saco, Maine. The scope includes demolition of existing pavement and curbs, earthwork, new asphalt and concrete pavement, installation of granite curbs and detectable warning surfaces, extensive electrical work (conduit, junction boxes, cabinets, and traffic signal equipment), construction of various pole foundations and mast‑arm poles (22‑ft to 55‑ft), traffic‑control devices (signals, video detection, radio repeaters, signage, and a portable changeable‑message sign), and related site work such as erosion control and utility relocation. Four contractors submitted competitive bids ranging from roughly $718 k to $835 k; the lowest bid after a small alternate deduction totals $717,673. The solicitation was opened on 11/14/24 and the bid tabulation was compiled on 11/13/24. No award decision, contract term, or agency contact details are provided in the excerpt.
• Full‑line item breakdown (48 pay items) covering demolition, paving, curbing, electrical, signal hardware, and ancillary work.
• Four bidders: Dagle Electrical Construction Corp., Moulison Heavy Electrical, Electric Light Company, Inc., and A.D. Electric.
• Total estimated contract value under $800 k, with the lowest bidder at $717,673 after alternate deduction.