Awarded vendors
- Two Oaks Construction
- James Pving
Description
This contract concerns a comprehensive longitudinal transverse milling and resurfacing project for all districts under Central Alabama Water’s jurisdiction. The scope includes milling of existing pavement (up to 4 in. depth) across roughly 990,000 sq ft, resurfacing at multiple thickness bands (1.5 in. and 4 in.) with total resurfaced area exceeding 1 million sq ft, line striping, traffic loop installation, and a hot‑asphalt leveling course. The bid was evaluated on July 11 2024, with two firms—Two Oaks Construction and James Pving—submitting proposals; the lowest responsible and responsive bidder is indicated but not named. The financials show a final contract value of $1,881,750 after adjustments. The procurement was conducted via full and open competition, using unit‑price pricing for each line item, and the work is pending board approval.
• Scope: milling, resurfacing, striping, traffic loops, and hot‑asphalt leveling across all districts.
• Financials: final estimated contract amount $1,881,750.
• Procurement: open competition, unit‑price pricing, minority‑vendor flag checked, pending board award.