Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Civil Engineering
  5. ›Main Street Off-Street Multi-purpose Pathway

Awarded contract·City of Bellevue·Washington

Main Street Off-Street Multi-purpose Pathway

Won by Pivetta Bros Construction Inc +10 more$2.8MMultiple Award
Contract source

Awarded vendors

  • Pivetta Bros Construction Inc
  • Northwest Cascade, Inc.
  • ACI
  • Sunset Grill Construction
  • Granite Construction Company
  • SLE Inc.
  • RW Scott Construction Co
  • Road Construction Northwest, Inc.
  • CR Construction
  • Fury Site Works Inc
  • Kamins Construction

Description

The contract is for the construction of a multi-purpose pathway in Bellevue, Washington. The work includes clearing and grubbing, removing asphalt pavement, constructing storm drainage improvements, and installing metal safety railing, among other tasks. The engineer's estimate for the project is between $2,530,000 and $3,280,000. A Disadvantaged Business Enterprise (DBE) Condition of Award (COA) Goal of 17% has been established for this contract. The contract was bid on by 12 different vendors, with the lowest bid being $2,817,817.00 by ACI. The key aspects of this contract include: • Construction of a multi-purpose pathway • Clearing and grubbing • Removing asphalt pavement • Constructing storm drainage improvements • Installing metal safety railing • Traffic signal modification • Channelization and signing • Installation of irrigation system and landscaping • Property restoration and miscellaneous work The contract is expected to be completed within a certain timeframe, although the exact duration is not specified. The City of Bellevue is the contracting agency, and Kelly Dang is the point-of-contact for the contract.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Civil Engineering
NAICS
237310
Solicitation №
25036

Contract value

$2,817,817

The contract value can be estimated based on the engineer's estimate, which is between $2,530,000 and $3,280,000. The lowest bid price is $2,817,817.00, which is within the estimated range. Therefore, the estimated value of the contract is around $2,817,817.00.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Charlotte·North Carolina

Top match · 66%

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

Georgia City of College Park·Georgia

65% match

MAIN STREET STREETSCAPE IMPROVEMENTS

Closes 11/10/2026Opened 10/28/2026

City of Charlotte·North Carolina

64% match

SouthPark Loop - Cameron Valley Parkway

Rolling / TBD closeOpened 1/1/2027

City of Hampton·Virginia

64% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/30/2026

City of Charlotte·North Carolina

64% match

Margaret Wallace Road Sidewalk Summerfield Ridge Ln to Marshbrooke Rd

Rolling / TBD closeOpened 7/1/2028

City of Charlotte·North Carolina

63% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

City of Harrisonburg·Virginia

63% match

Northend Greenway (NEG) Brookside ITB (2027020-PW-B)

Closes 12/10/2026Opened 10/22/2026

City of Brandon·Mississippi

63% match

GRANTS FERRY PARKWAY MULTI-USE PATH PHASE 2

Closes 11/13/2026Opened 10/13/2026

City of Cincinnati·Ohio

63% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

City of Goshen, Indiana·Indiana

62% match

Cherry Creek Trailway, Phase I

Closes 11/5/2026Opened 10/17/2026

State of Delaware DOT·Delaware

62% match

ADAMS STREET PATHWAY PHASE II

Closes 11/17/2026Opened 10/19/2026

City of Kearney·Missouri

62% match

Mack Porter Park Connector Shared Use Path - Kearney, MO

Closes 11/3/2026Opened 10/6/2026

Massachusetts Department of Transportation·Massachusetts

62% match

609204 BELMONT FAP No. STP/CMQ/TAP-0034(035)X Community Path, Belmont Component of the MCRT (Phase

Closes 11/10/2026Opened 9/14/2026

County of Fairfax·Virginia

62% match

Advertisement for Bid for the Little River Turnpike Walkway – Eastbound

Closes 11/30/2026Opened 10/30/2026

Camden County·New Jersey

61% match

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

Town of Bluffton·South Carolina

61% match

Pathway Pedestrian Improvements Phase 3

Closes 11/12/2026Opened 10/13/2026

Nevada Government·Nevada

61% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

City of Fairfield·Ohio

61% match

Installation of 7,000‑ft separated shared‑use asphalt path on Pleasant Avenue (US 127) – resurfacing, storm sewer, water main, curb, retaining walls, and signalized crosswalks in Butler County, Ohio.

Closes 11/17/2026Opened 10/23/2026

City of Ontario·California

61% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

Idaho Transportation Department·Idaho

61% match

Key No. 13905 N 10TH AVE ITS & OVERLAY

Closes 11/17/2026Opened 10/10/2026

Louisiana City of New Orleans·Louisiana

61% match

Curbside Management

Closes 12/17/2026Opened 10/22/2026

Missouri Department of Transportation·Missouri

61% match

NW District, City of Maryville, South Main Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

City of Toledo·Ohio

61% match

Telegraph Road & Alexis Road Resurfacing & Multi-Use Path, LUC-US24-28.3, PID 117877

Closes 11/17/2026Opened 10/23/2026

City of Charlotte·North Carolina

61% match

Shamrock Drive Complete Street

Rolling / TBD closeOpened 4/1/2027

City of Rock Hill·South Carolina

61% match

SCP: Downtown Traffic Management Project Components 1 and 2 - Intelligent Transportation System (ITS) and Wilson Street Improvements

Closes 11/18/2026Opened 10/9/2026