The contract is for the provision of gas turbine filters for the City of Roseville Energy Park. The bid summary sheet lists the total cost of the contract as $74,903.40. The scope of work includes the supply of gas turbine filters. The contract was awarded to two vendors, Fastenal Company and Harrington Industrial Plastics.
• The contract is for a specific product, gas turbine filters.
• The contract has a total cost of $74,903.40.
• The contract was awarded to two vendors.
• The scope of work includes the supply of gas turbine filters.