Description
This solicitation seeks a qualified contractor to perform nuisance abatement through full wet demolition of a damaged wood‑frame structure at 411 Marshall Street, Mobile, AL, including utility disconnection, debris removal, erosion and sediment control, and site stabilization. The work must be completed within a 15‑day period after receipt of a written Notice to Proceed, with strict compliance to lead‑based paint, asbestos, and environmental regulations. The City requires proof of E‑Verify enrollment, appropriate insurance, and submission of AIA payment and lien documents at close‑out.
• Scope includes demolition, utility capping, debris clearance, BMPs, permanent seeding, and final documentation.
• Contractor must provide a single whole‑dollar lump‑sum quote inclusive of taxes, with $250 per day liquidated damages for late completion.
• All required submissions (E‑Verify, insurance, AIA forms, waste‑shipment records, photos) must be delivered within the timelines specified in the RFQ.