This solicitation (RFQ 23.24.406 DL) seeks a Construction Manager‑at‑Risk to deliver a water main replacement along 36th Street and relocate Lift Station 52. The scope includes design‑build services, coordination with existing utilities, excavation, pipe installation, testing, and restoration of surface improvements. The procurement was closed on July 8 2024 and has been awarded, though the awardee details are not disclosed in the provided excerpt.
• Construction Manager‑at‑Risk (CMAR) delivery method for integrated design and construction.
• Focus on water infrastructure: 36th Street water main and lift‑station relocation.
• Closed bidding process (RFQ) with award status indicated as “Awarded.”
Attached files
The award documents live at the source — open the contract source above to download them.