The contract is for the 2024 Asphalt Pavement Improvements project at the Bedford Reservation. The project involves a repair and overlay approach for the pavement, including a 1-1/2" asphalt overlay on approximately 5.22 miles of roadway and 37,158 square yards of parking lot and existing asphalt trail pavement. The contract was awarded to Ronyak Paving, Inc. for a lump sum amount of $1,348,700. The scope of work includes pavement marking restoration, setting of parking blocks, berming, and upgrades of 5 ADA road crossings.
• The project is located at the Bedford Reservation.
• The contract is for a lump sum amount of $1,348,700.
• The scope of work includes a 1-1/2" asphalt overlay on approximately 5.22 miles of roadway and 37,158 square yards of parking lot and existing asphalt trail pavement.
• The project includes pavement marking restoration, setting of parking blocks, berming, and upgrades of 5 ADA road crossings.
• The contract was awarded to Ronyak Paving, Inc.
• The project is expected to be completed within the period of January 1, 2024 through December 31, 2024.