This competitive bid solicitation concerns site‑work for a relocatable Head Start building at Harrison Elementary School. The scope includes earthwork, grading, excavation, foundation preparation, and installation of water, sewer, and storm‑drain utilities, as well as temporary and permanent access roads and parking pads. Optional alternates allow for future irrigation pipe sleeves, conduit installations, and an alternate trenching method for electrical/signal conduits. Four contractors submitted bids, each ranging from approximately $583 k to $662 k, with a 10 % contingency and several alternates totaling an estimated project value near $2.8 million. The bid opening occurred on February 1 2018 at the SUSD Purchasing Department. No award or contract execution details are included.
• Primary work: grading, utilities, and site‑access improvements for a relocatable school structure.
• Optional alternates: future irrigation upgrades and alternative conduit routing.
• Competitive bid with four bidders; award outcome not disclosed.
• Located in Stockton, California, funded by the Stockton Unified School District.