The contract is for the Cefe Valenzuela Pavement Life Cycle Replacement project, which involves the reconstruction of the Cefe F. Valenzuela Landfill Access Road and County Road 20. The project includes the widening of the roadways, removal and replacement of existing asphalt pavement, and installation of erosion and sediment control measures. The engineer's estimate for the project is $4,870,000. The contract was awarded through a public bid process, and the bid results worksheet lists three contractors: RS Salinas Const, Fox Box Ltd, and HAPS Anderson.
• The project includes the reconstruction of the Cefe F. Valenzuela Landfill Access Road and County Road 20.
• The project involves the widening of the roadways and removal and replacement of existing asphalt pavement.
• The project includes the installation of erosion and sediment control measures.
• The engineer's estimate for the project is $4,870,000.
• The contract was awarded through a public bid process.