Awarded vendors
- Tru Form Construction
- Mainline Contracting
- Heavy Constructors
- Highmark Inc.
- Site Works Specialists
- Underground Construction
- RCS
- Hills Materials
Description
The contract is for the widening of Mallow Street, the construction of approximately 76 feet of C-wall sidewalk with ADA ramp, and the relocation of a fire hydrant. The project has an advertising authority of $70,000.00 and the engineer's estimate is $75,000.00. The bidders and their bids are listed in the "BID RESULTS AS READ" section.
• The project includes the construction of a C-wall sidewalk with ADA ramp.
• The project includes the relocation of a fire hydrant.
• The advertising authority for the project is $70,000.00.
• The engineer's estimate for the project is $75,000.00.
• The bidders and their bids are listed in the "BID RESULTS AS READ" section.