The contract is for the supply of concrete on an "as needed" basis for a one-year period beginning January 1, 2024, through December 31, 2024, to various locations throughout Cleveland Metroparks. The contract includes the supply of 3000 psi, 3500 psi, 4000 psi, 4500 psi, Class C, LSM 50, and LSM 100 concrete, as well as additives, additional services, and colors. The contract was awarded to Shelly Materials, d/b/a Medina Supply Company, with a total cost not to exceed $100,000.
• The contract is for a one-year period.
• The contract includes the supply of various types of concrete.
• The contract was awarded to Shelly Materials, d/b/a Medina Supply Company.
• The total cost of the contract is not to exceed $100,000.