The County of Riverside awarded a contract for the Lakeland Village Community Center flooring demolition and installation project to WB Flooring Solutions Inc. The project involves removing and replacing the flooring at the community center, with the contractor providing all required labor, materials, permits, plans, and inspections. The contract duration is 60 days, and the total cost is $68,303.41. The contractor must comply with DIR registration and prevailing wage requirements.
• The project is subject to DIR registration and prevailing wage requirements.
• The contractor must provide all required labor, materials, permits, plans, and inspections.
• The contract duration is 60 days.
• The total cost is $68,303.41.
• The contractor must comply with the terms and conditions of the contract, including payment terms, bid bond, and performance bond.