The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the construction of the DWS 1385 Restroom Remodel project. The project involves the remodel of existing restroom spaces in a 4-level office building, including the demolition of existing restrooms and the installation of new water closets, urinals, lavatories, and other fixtures. The construction cost estimate for the project is $1,585,000.00. A mandatory pre-bid meeting and site visit will be held at 2:00 PM on Tuesday, September 10, 2024. The key features of the project include:
• Remodel of existing restroom spaces in a 4-level office building
• Demolition of existing restrooms and installation of new fixtures
• Construction cost estimate of $1,585,000.00
• Mandatory pre-bid meeting and site visit on September 10, 2024
• Project location: 1385 South State Street, Salt Lake City, UT
Attached files
The award documents live at the source — open the contract source above to download them.