The contract is for the Lakemont Blvd SE and SE Newport Way Signal Improvements project, which involves removing temporary traffic signal poles and spanwire and replacing them with permanent City of Bellevue standard signal mast arm pole, foundation, and related equipment. The project also includes installing pedestrian signal mast arm poles, foundations, and equipment, as well as traffic island restoration. The contract was awarded to West Coast Signal, Inc. and TITAN Earthwork, LLC.
• The project involves construction surveying, traffic signal system modification, and permanent signing.
• The contract includes various line items, such as mobilization, traffic control supervisor, flaggers and other traffic control labor, and roadside cleanup.
• The bid tabulation section provides a detailed breakdown of the bids received from the vendors.