The Department of Sanitary Sewer Services is soliciting bids for the Q-615 Pump Station No. 81 Force Main Replacement Project, located in the City of Tallmadge, Ohio. The work consists of installing 1469 LF of 8-inch PVC C-900 sanitary sewer force main and related fittings, abandoning 1610 LF of 8-inch Ductile Iron sanitary sewer force main and related fittings, and performing erosion control and site restoration. The contract award will be based on the determination of the lowest and most responsive and responsible bid for the specific project option selected for construction by the County.
• The project includes installing 1469 LF of 8-inch PVC C-900 sanitary sewer force main and related fittings.
• The project includes abandoning 1610 LF of 8-inch Ductile Iron sanitary sewer force main and related fittings.
• The project includes performing erosion control and site restoration.
• The contract award will be based on the determination of the lowest and most responsive and responsible bid.
• The project is expected to be completed within 105 calendar days after notice to proceed.
• The project is expected to be substantially completed within 125 calendar days after notice to proceed.