The City of Colorado Springs is seeking a qualified contractor to replace the Water Street bridge over Camp Creek, including associated roadway, utility, and water‑line work. This fixed‑unit‑price contract is valued at approximately $5.5 million, with a 100‑day construction period after the final Notice‑to‑Proceed. The scope covers demolition, bridge design and construction, utility relocations, traffic control, storm‑water management, and all related permitting and inspections. Bidders must meet extensive bonding, insurance, and local‑labor‑preference requirements, and must attend a virtual pre‑bid conference.
• Replace existing bridge (~460 ft) with new structure, approach slabs, and pedestrian improvements.
• Relocate and replace water‑line utilities, coordinate with multiple city utilities, and provide storm‑water management and erosion control.
• Deliver complete construction‑management services, including QA/QC testing, as‑built drawings, warranties, and required performance bonds.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.