The Town of Camp Verde is seeking qualified contractors to execute the Park Verde Road Irrigation Crossing Improvements Project. The scope includes demolition of existing roadway and structures, installation of a precast concrete box culvert, extensive earthwork, utility relocation, pavement reconstruction, and related site work. An optional alternate adds a new watermain installation. Bidders must submit a detailed, lump‑sum bid by the deadline and may attend an optional pre‑bid meeting on October 15, 2026.
• Remove existing chain‑link fence, catwalk, concrete bridge, and asphalt.
• Perform earthwork (excavation, sediment removal, backfill) to accommodate a 6′ × 3′ × 38′ precast box culvert.
• Install steel utility casing, engineered fill, riprap, and landscape walls.
• Re‑pave roadway, apply tack coat, install painted centerlines, safety rail, and traffic delineators.
• Optional watermain alternate: install 8″ ductile‑iron watermain, valves, and associated testing.
• Provide all required surveying, traffic control, quality‑control testing, and documentation.