Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Iowa guideIowa Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Iowa
  4. ›Construction
  5. ›8th Avenue Bridge Replacement and Floodwalls at Cedar River

City of Cedar Rapids·Iowa

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes in 3 days$6M – $12MInvitation for Bid
Get bids like this by emailBid source

Description

The City of Cedar Rapids is soliciting bids for a comprehensive public improvement project that includes demolition of the existing 8th Avenue bridge, construction of a new cable‑stayed river bridge, installation of an integrated flood‑control system (floodwalls, MSE walls, and related hydraulic structures), reconstruction of approach roadways, sidewalks, trails, utility relocation, and lighting upgrades. The Engineer’s probable cost estimate is $123 million, with an anticipated start upon notice to proceed (Jan/Feb 2027) and a final completion schedule of 1,250 calendar days. The scope covers heavy civil engineering, structural steel, concrete work, geotechnical micropiles, stay‑cable systems (subject to FHWA Buy‑America), and extensive roadway and utility work. Bidders must submit a bid bond, bidder status form, and comply with extensive specifications, including Buy‑America, environmental, and safety requirements. A pre‑bid conference is scheduled for 09/14/2026 (in‑person and via Microsoft Teams). • Demolition of existing bridge and related structures • Design‑build of a new cable‑stayed bridge crossing the Cedar River • Integrated flood‑control components (floodwalls, MSE walls, drainage) • Roadway, sidewalk, and trail reconstruction on 8th Avenue corridor • Utility relocation, lighting, and traffic improvements • Extensive geotechnical works (micropiles, drilled shafts, shoring) • Compliance with FHWA Buy‑America, environmental, and safety standards • Estimated construction cost $123 M; project duration 1,250 days

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
8/26/2026
Questions due
10/29/2026
Pre-bid meeting
9/14/2026
Closes
11/4/2026
Duration
1250 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
3318551-01 Addendum 3

Budget estimate

$6,000,000 – $12,000,000

The Engineer’s probable cost is $123 million. Assuming typical contractor profit margins for large civil infrastructure (5‑10 % of total construction cost), the net budget to the winning contractor would likely fall between roughly $6 million (5 %) and $12 million (10 %). Additional revenue could be generated from change orders, overtime, and performance incentives, but the base estimate provides a reasonable range.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Cedar Rapids·Iowa

Top match · 99%

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

99% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

99% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

99% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

99% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

98% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

90% match

Ellis Blvd NW Levee and Floodwall Improvements

Closes 11/18/2026Opened 10/21/2026

City of Cedar Rapids·Iowa

90% match

8th Ave Bridge Replacement & Floodwalls Construction Engineering & Inspection Services

Closes 11/10/2026Opened 10/20/2026

City of Cedar Rapids·Iowa

87% match

Kirkwood Boulevard SW from Rolling Ridge Drive to 66th Avenue Rehabilitation

Closes 11/4/2026Opened 10/21/2026

City of Cedar Rapids·Iowa

87% match

34th Street SE from North of Terry Drive to Cottage Grove Avenue

Closes 11/18/2026Opened 10/21/2026

Delaware River Joint Toll Bridge Commission·New Jersey

84% match

Portland‑Columbia Toll‑Supported Pedestrian Bridge Rehabilitation

Closes 11/5/2026Opened 10/1/2026

City of Meriden·Connecticut

84% match

B027-23 Oregon Road Bridge Replacement

Closes 12/10/2026Opened 10/30/2026

City of St. Louis Board of Public Service·Missouri

83% match

Removal & Replacement of Southwest & Columbia Bridges

Closes 11/10/2026Opened 10/7/2026

City of Palm Springs·California

83% match

East Palm Canyon Bridge Project

Closes 11/20/2026Opened 10/20/2026

City of Creve Coeur·Missouri

83% match

Malcolm Terrace Park Bridge and Deer Creek Stabilization

Closes 11/12/2026Opened 10/22/2026

City of Ormond Beach - Purchasing Office·Florida

83% match

Main Trail Bridge Repair

Closes 11/6/2026Opened 9/27/2026

City of High Point·North Carolina

83% match

Bid 09-110426 Bridges Preservation Project

Closes 11/4/2026Opened 10/2/2026

NYS OGS Design & Construction - Construction Contractors·New York

82% match

Rehabilitate Floodwalls – Project 46196‑C (Cheektowaga, NY)

Closes 11/18/2026Opened 10/13/2026

City of Cedar Rapids·Iowa

82% match

Cedar Lake Amenities Bid Package 3B: Recreational Amenities

Closes 11/18/2026Opened 10/22/2026

City of Seattle·Washington

82% match

Pedestrian Crossing Safety Improvements (FHWA)

Closes 11/4/2026Opened 10/14/2026

County of Marin·California

82% match

MCP 2026-07 CASCADE CANYON TRAIL BRIDGE PROJECT

Closes 12/3/2026Opened 10/27/2026

City of St. Louis Board of Public Service·Missouri

82% match

Union Lindell Bridge Replacement

Closes 11/3/2026Opened 9/16/2026

City of Madison·Wisconsin

82% match

Castle Creek Channel Improvements at Warner Park

Closes 11/5/2026Opened 10/23/2026

CPPJ Road, Bridge, & Utility·Louisiana

82% match

Garrie Cut‑Off Bridge Replacement Project – Calcasieu Parish Bridge Replacement

Closes 11/17/2026Opened 10/20/2026

Georgia Cobb County Department of Transportation·Georgia

82% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026