Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Iowa guideIowa Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Iowa
  4. ›Civil Engineering
  5. ›8th Avenue Bridge Replacement and Floodwalls at Cedar River

City of Cedar Rapids·Iowa

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes in 3 days$100M – $130MInvitation for Bid
Get bids like this by emailBid source

Description

The City of Cedar Rapids is soliciting bids for a comprehensive public‑improvement project that replaces the existing 8th Avenue bridge over the Cedar River and constructs an integrated flood‑control system. The scope includes demolition of the existing structure, design‑build of a new cable‑stayed bridge, construction of floodwalls, approach roadways, traffic improvements, sidewalks, trail reconstruction, utility relocation, and lighting. The Engineer’s probable cost is $123 million and the project must be completed within 1,250 calendar days after the notice to proceed (anticipated Jan/Feb 2027). Bidders must submit a bid bond, complete the required forms, and adhere to extensive Iowa DOT and AASHTO specifications for MSE walls, retaining structures, and bridge components. A pre‑bid conference is scheduled for 09/14/2026 (in‑person and via Microsoft Teams). • New cable‑stayed river bridge (full bridge superstructure, stay‑cable system, deck panels, railings). • Integral flood‑control walls and floodwall structures. • Demolition of existing bridge and associated structures. • Approach roadway reconstruction, traffic signal upgrades, sidewalks, and shared‑use trail. • Utility relocation, lighting, and storm‑water infrastructure. • Extensive geotechnical, structural, and environmental testing (load tests, vibration/noise monitoring, slope stability). • Mandatory compliance with Iowa DOT specifications, AASHTO LRFD, and city equal‑employment‑opportunity policies.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
8/26/2026
Questions due
10/29/2026
Pre-bid meeting
9/14/2026
Closes
11/4/2026
Duration
1250 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237990
Solicitation №
3318551-01 Addendum 2

Budget estimate

$100,000,000 – $130,000,000

The Engineer’s probable cost is listed as $123 million, which typically represents the total construction contract value. Assuming the winning contractor receives the full construction fee (including materials, labor, overhead, and profit), the budget will be in the low‑to‑mid $100 million range. Factors influencing the final amount include change orders, unforeseen site conditions, and the exact scope of utility and lighting work. A reasonable estimate is $100 M – $130 M.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Cedar Rapids·Iowa

Top match · 99%

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

99% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

99% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

99% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

98% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

98% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

90% match

Ellis Blvd NW Levee and Floodwall Improvements

Closes 11/18/2026Opened 10/21/2026

City of Cedar Rapids·Iowa

90% match

8th Ave Bridge Replacement & Floodwalls Construction Engineering & Inspection Services

Closes 11/10/2026Opened 10/20/2026

City of Cedar Rapids·Iowa

86% match

Kirkwood Boulevard SW from Rolling Ridge Drive to 66th Avenue Rehabilitation

Closes 11/4/2026Opened 10/21/2026

City of Cedar Rapids·Iowa

86% match

34th Street SE from North of Terry Drive to Cottage Grove Avenue

Closes 11/18/2026Opened 10/21/2026

Delaware River Joint Toll Bridge Commission·New Jersey

83% match

Portland‑Columbia Toll‑Supported Pedestrian Bridge Rehabilitation

Closes 11/5/2026Opened 10/1/2026

City of Meriden·Connecticut

83% match

B027-23 Oregon Road Bridge Replacement

Closes 12/10/2026Opened 10/30/2026

City of Cedar Rapids·Iowa

82% match

Cedar Lake Amenities Bid Package 3B: Recreational Amenities

Closes 11/18/2026Opened 10/22/2026

City of St. Louis Board of Public Service·Missouri

82% match

Removal & Replacement of Southwest & Columbia Bridges

Closes 11/10/2026Opened 10/7/2026

City of Palm Springs·California

82% match

East Palm Canyon Bridge Project

Closes 11/20/2026Opened 10/20/2026

Iowa City·Iowa

82% match

City Hall ADA Elevator Modernization Project

Closes 11/19/2026Opened 10/7/2026

City of Creve Coeur·Missouri

81% match

Malcolm Terrace Park Bridge and Deer Creek Stabilization

Closes 11/12/2026Opened 10/22/2026

City of Ormond Beach - Purchasing Office·Florida

81% match

Main Trail Bridge Repair

Closes 11/6/2026Opened 9/27/2026

City of Madison·Wisconsin

81% match

Castle Creek Channel Improvements at Warner Park

Closes 11/5/2026Opened 10/23/2026

Platte County Parks Department·Missouri

81% match

Burlington Creek Bridge Remediation

Closes 11/5/2026Opened 10/19/2026

NYS OGS Design & Construction - Construction Contractors·New York

81% match

Rehabilitate Floodwalls – Project 46196‑C (Cheektowaga, NY)

Closes 11/18/2026Opened 10/13/2026

County of Marin·California

81% match

MCP 2026-07 CASCADE CANYON TRAIL BRIDGE PROJECT

Closes 12/3/2026Opened 10/27/2026

City of High Point·North Carolina

81% match

Bid 09-110426 Bridges Preservation Project

Closes 11/4/2026Opened 10/2/2026

Iowa Department of Agriculture and Land Stewardship·Iowa

81% match

26-16 Buc880725C (Buchanan)

Closes 11/12/2026Opened 10/17/2026

Sterling Heights·Michigan

81% match

NORTH VAN DYKE AVENUE CORRIDOR IMPROVEMENTS & STORMWATER RESILIENCE PLANNING

Closes 11/10/2026Opened 9/30/2026