Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Iowa guideIowa Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Iowa
  4. ›Construction
  5. ›8th Avenue Bridge Replacement and Floodwalls at Cedar River

City of Cedar Rapids·Iowa

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes in 3 days$6M – $12MInvitation for Bid
Get bids like this by emailBid source

Description

The City of Cedar Rapids is soliciting bids for a major infrastructure project that replaces the existing 8th Avenue bridge over the Cedar River and constructs an integrated flood‑control system. The scope includes demolition of the existing bridge, construction of a new cable‑stayed river crossing, associated floodwalls, approach roadways, traffic improvements, sidewalks, trail reconstruction, utility relocation, and roadway lighting. The engineer’s probable cost is $123 million, with an anticipated start upon notice to proceed in Jan/Feb 2027 and a contract duration of roughly 1,250 calendar days. Bidders must attend a pre‑bid conference on 15 Sep 2026 (optional) and submit all required forms, bonds, and pricing by 4 Nov 2026. The project is a traditional design‑build public works contract requiring compliance with local, state, and federal regulations, including equal‑employment‑opportunity and drug‑free‑workplace certifications. • Demolition of existing bridge structure • New cable‑stayed bridge construction • Integrated floodwall system along 8th Avenue corridor • Reconstruction of approach roadways, sidewalks, and multi‑use trail • Utility relocation and lighting installation • Required bid bond, contractor status form, and numerous certifications • Estimated construction cost $123 M; contract start early 2027; 1,250‑day duration

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
8/26/2026
Questions due
10/29/2026
Pre-bid meeting
9/15/2026
Closes
11/4/2026
Duration
1250 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
3318551-01

Budget estimate

$6,000,000 – $12,000,000

The engineer’s probable cost is $123 million. Assuming a typical contractor profit margin of 5‑10 % for large civil projects, the net earnings for the winning bidder would likely fall between roughly $6 million (5 %) and $12 million (10 %). This range accounts for the extensive scope (bridge, floodwalls, utilities, roadway, and landscaping) and the long contract duration, which increase both risk and opportunity for profit.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Cedar Rapids·Iowa

Top match · 99%

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

99% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

99% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

99% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

99% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

98% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

90% match

8th Ave Bridge Replacement & Floodwalls Construction Engineering & Inspection Services

Closes 11/10/2026Opened 10/20/2026

City of Cedar Rapids·Iowa

90% match

Ellis Blvd NW Levee and Floodwall Improvements

Closes 11/18/2026Opened 10/21/2026

City of Cedar Rapids·Iowa

87% match

Kirkwood Boulevard SW from Rolling Ridge Drive to 66th Avenue Rehabilitation

Closes 11/4/2026Opened 10/21/2026

City of Cedar Rapids·Iowa

86% match

34th Street SE from North of Terry Drive to Cottage Grove Avenue

Closes 11/18/2026Opened 10/21/2026

Delaware River Joint Toll Bridge Commission·New Jersey

83% match

Portland‑Columbia Toll‑Supported Pedestrian Bridge Rehabilitation

Closes 11/5/2026Opened 10/1/2026

City of Meriden·Connecticut

83% match

B027-23 Oregon Road Bridge Replacement

Closes 12/10/2026Opened 10/30/2026

City of Palm Springs·California

83% match

East Palm Canyon Bridge Project

Closes 11/20/2026Opened 10/20/2026

NYS OGS Design & Construction - Construction Contractors·New York

83% match

Rehabilitate Floodwalls – Project 46196‑C (Cheektowaga, NY)

Closes 11/18/2026Opened 10/13/2026

City of Creve Coeur·Missouri

82% match

Malcolm Terrace Park Bridge and Deer Creek Stabilization

Closes 11/12/2026Opened 10/22/2026

City of Ormond Beach - Purchasing Office·Florida

82% match

Main Trail Bridge Repair

Closes 11/6/2026Opened 9/27/2026

City of St. Louis Board of Public Service·Missouri

82% match

Removal & Replacement of Southwest & Columbia Bridges

Closes 11/10/2026Opened 10/7/2026

City of Cedar Rapids·Iowa

82% match

Cedar Lake Amenities Bid Package 3B: Recreational Amenities

Closes 11/18/2026Opened 10/22/2026

City of St. Louis Board of Public Service·Missouri

82% match

Union Lindell Bridge Replacement

Closes 11/3/2026Opened 9/16/2026

Georgia Cobb County Department of Transportation·Georgia

82% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

City of High Point·North Carolina

81% match

Bid 09-110426 Bridges Preservation Project

Closes 11/4/2026Opened 10/2/2026

Georgia City of Chattahoochee Hills·Georgia

81% match

RFP27-001 Cochran Mill Park Bridge Repair/Replacement

Closes 11/19/2026Opened 10/16/2026

CPPJ Road, Bridge, & Utility·Louisiana

81% match

Garrie Cut‑Off Bridge Replacement Project – Calcasieu Parish Bridge Replacement

Closes 11/17/2026Opened 10/20/2026

City of Cedar Rapids·Iowa

81% match

2nd Street SE Relocation of Interior Vault Utilities

Closes 11/18/2026Opened 10/21/2026

City of Alexandria·Louisiana

81% match

Masonic Drive Sidewalk - Hynson Bayou Pedestrian Bridge Replacement

Closes 12/1/2026Opened 10/23/2026