Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Georgia guideGeorgia Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Georgia
  4. ›Engineering Services
  5. ›Engineering Design Services for Factory Shoals Pedestrian…

Georgia Cobb County Department of Transportation·Georgia

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026$800k – $1.3MRequest for Qualification
Get bids like this by emailBid source

Description

The Cobb County Department of Transportation (Cobb DOT) is issuing a Request for Qualifications (RFQ) to identify a qualified engineering consulting firm to provide full design services for the Factory Shoals Pedestrian Bridge (Project No. B2464), a new 12‑ft shared‑use bridge over I‑20 with accompanying right‑of‑way and utility coordination. The scope includes survey data, concept development, environmental documentation, preliminary, right‑of‑way, and final design plans, and integration of water‑sewer utilities. The contract will be a multi‑phase, project‑specific agreement (lump‑sum, cost‑plus, or unit‑rate) that remains in effect until construction completion. The selection process consists of a Phase I pre‑qualification (SOQ) and Phase II technical approach evaluation, with a non‑mandatory virtual pre‑proposal conference on October 27, 2026. • Location: Marietta, Georgia (Cobb County) • Service: Full civil/bridge engineering design, environmental and utility coordination • Contract type: Project‑specific, multi‑phase (Lump Sum/Cost‑Plus/Unit Rate) • Submission deadline: November 12, 2026 (12:00 PM ET) • Pre‑proposal conference (optional): October 27, 2026, 11:00 AM via Microsoft Teams • Required pre‑qualifications: GDOT Area Classes for bridge, roadway, pedestrian, environmental, utility, and NEPA studies • Award: Negotiated after Phase II; no fixed award date disclosed • Estimated contract length: Through design and construction completion (several years) • Primary contact: Cameron Eveler, Buyer Contact, (770) 528‑8420, [email protected]

Attached files

Contact

Cameron Eveler(Buyer Contact)

[email protected]

(770) 528-8420

Key dates

Opened
10/16/2026
Questions due
11/6/2026
Pre-bid meeting
10/27/2026
Closes
11/12/2026

Last updated

Details

Type
Request for Qualification
Industry
Engineering Services
NAICS
541330
Solicitation №
PE-77050-NONST-2027-000000111

Budget estimate

$800,000 – $1,300,000

The solicitation does not disclose a contract value. Similar municipal bridge design contracts in the Atlanta metro area typically range from $500,000 for preliminary design to $1.5 million for complete design‑build services, depending on project complexity, utility coordination, and environmental study requirements. Assuming Cobb County will require full design (survey, concept, preliminary, right‑of‑way, and final plans) plus integration of water‑sewer utilities, a reasonable estimate is $800 k – $1.3 M. Factors influencing the final amount include the chosen contract type (lump‑sum vs. cost‑plus), the extent of utility relocation, and any additional mitigation studies required by GDOT or federal funding conditions.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Cobb County, GA·Georgia

Top match · 96%

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Georgia City of Winder·Georgia

91% match

RFQ# 2026-01 Jackson St. @ SR8 (May St.) - Pedestrian Bridge (PI#0021599)

Closes 11/19/2026Opened 10/12/2026

Georgia City of Atlanta·Georgia

90% match

QBS/PS/DOT/2609-1270086/Marietta Road Bridge Replacement Over CSX - Phase I

Closes 11/23/2026Opened 10/21/2026

Georgia Henry County Board of Commissioners·Georgia

87% match

(RFQ) 27-23, Engineering and Design Services for Gardner Road Bridge

Closes 11/19/2026Opened 10/22/2026

Henry County·Georgia

87% match

(RFQ) 27-23, Engineering and Design Services for Gardner Road Bridge

Closes 11/19/2026Opened 10/22/2026

Georgia Cobb County Department of Transportation·Georgia

87% match

Notice of Intent to Advertise - Design Build Services for the Chattahoochee River Trail Project

Closes 1/15/2027Opened 9/10/2026

Georgia Bulloch County Board of Commissioners·Georgia

86% match

Airport Consulting Services - Engineering

Closes 12/3/2026Opened 10/29/2026

City of Atlanta·United States of America

86% match

RFP/DWM/2609-1270055/Architectural, Engineering, Design and Construction

Closes 11/23/2026Opened 10/23/2026

City of Charlotte·North Carolina

85% match

Bridge Repair Design

Rolling / TBD closeOpened 6/30/2028

City of Minot·North Carolina

85% match

RFQ: CITY BRIDGE REHABILITATION PROJECT 5060

Closes 11/20/2026Opened 10/30/2026

Georgia City of Albany·Georgia

85% match

27-034 ROADWAY ENGINEERING AND TRAFFIC SIGNAL DESIGN SERVICES

Closes 11/23/2026Opened 10/22/2026

Georgia Cobb County Department of Transportation·Georgia

85% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

Brunswick County·North Carolina

85% match

RFQ: Engineering Services for Highway 74 Parallel Force Main

Closes 11/23/2026Opened 10/22/2026

Georgia City of Brookhaven·Georgia

84% match

RFQ 26-112 On-Call Professional Services

Closes 11/25/2026Opened 10/22/2026

City of Atlanta·Georgia

84% match

QBS/PS/DOT/2609-1270086/Marietta Road Bridge Replacement Over CSX - Phase I

Closes 11/23/2026Opened 10/21/2026

Cuyahoga County·Ohio

84% match

RQ16425: Highland Road Bridge Engineering Services

Closes 11/5/2026Opened 10/5/2026

Transportation, NYS Dept. of·New York

84% match

Design Services for Loop Parkway over Long Creek Bridge Project, Town of Hempstead, Nassau County

Closes 11/19/2026Opened 10/28/2026

Massachusetts City of Taunton·Massachusetts

84% match

Design Services for Danforth Street Bridge

Closes 11/12/2026Opened 10/14/2026

Georgia Department of Transportation·Georgia

84% match

RFQ 484-112326 On-Call Roadway Design Services, Statewide

Closes 11/23/2026Opened 10/22/2026

Nevada County·California

84% match

Rock Creek Road at Rock Creek Bridge – Engineering Design Services

Closes 11/30/2026Opened 10/15/2026