Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›CIP 107 - Citywide Slurry Seal Project

City of Hermosa Beach·California

CIP 107 - Citywide Slurry Seal Project

Closes 5/21/2026$300k – $450kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Hermosa Beach is seeking a qualified contractor to perform a city‑wide pavement preservation effort that includes crack‑sealing, pothole repair, removal of existing striping, application of a Type II slurry seal (2.5 % latex) and installation of new pavement markings, curb painting, and signage across multiple streets. The work must be completed within 35 working days after the Notice to Proceed and includes mandatory pre‑bid conference attendance. The contract will be awarded to the lowest responsive, responsible bidder. • Scope: Type II slurry seal, crack sealing, striping (yellow lines, double‑yellow, limit lines, crosswalks, “L”/“T” parking), red curb refresh, speed‑hump salvage/re‑install, utility cover protection. • Locations: Primarily Loma Drive, Sunset Drive, 8th St, Cypress Ave, and related municipal streets in Hermosa Beach. • Schedule: Pre‑bid conference 11 May 2026 (mandatory); bid submission 21 May 2026; contract duration 35 working days post‑NTP. • Requirements: California A‑class contractor license, DIR public‑works registration, CARB fleet compliance, 10 % bid bond, 100 % performance/payment bonds, prevailing‑wage compliance, insurance, and safety program.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Magvern By(Project Manager)

[email protected]

(310) 318-0257

Key dates

Opened
4/30/2026
Questions due
5/14/2026
Pre-bid meeting
5/11/2026Mandatory
Closes
5/21/2026
Duration
35 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
BID 26-002

Budget estimate

$300,000 – $450,000

The bid documents list an estimated project value of $380,000. Considering typical contractor margins (≈10‑15 %) and possible change‑order adjustments, the net earnings for the winning firm are likely to fall between $300 k and $450 k. Factors influencing the range include the exact volume of streets, any unforeseen utility work, and the amount of additional crack‑seal or pothole repairs required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Lake Havasu City·Arizona

Top match · 71%

FY2026-27 Chip Seal Program

Closes 11/18/2026Opened 10/21/2026

Lake Havasu City·Arizona

71% match

FY26-27 Chip Seal Program

Closes 11/18/2026Opened 10/21/2026

City of Laguna Hills·California

70% match

Citywide Pavement Rehabilitation, CIP 101-M

Closes 12/1/2026Opened 10/29/2026

City of Ann Arbor·Michigan

70% match

2027 Sewer Lining Project

Closes 12/2/2026Opened 10/30/2026

City Utilities·Indiana

69% match

77635 - 2026 CIPP Pkg 1 Small and Medium Diameter

Closes 11/5/2026Opened 10/16/2026

City of Marysville, Ohio·Ohio

68% match

2027 Sanitary Sewer Cured‑in‑Place Pipe (CIPP) Lining Project

Closes 11/20/2026Opened 10/30/2026

City of Ventura·California

68% match

Public Works Contracts

Rolling / TBD closeOpened 2/13/2025

Lake Havasu City·Arizona

68% match

RE-BID FY 2026-2027 CRACK/MASTIC SEAL PROGRAM

Closes 11/23/2026Opened 10/29/2026

City of Independence·Missouri

67% match

2024 Neighborhood Sanitary Sewer CIP Project No. 302004-2

Closes 11/4/2026Opened 10/7/2026

George County Board of Supervisors·Mississippi

67% match

GC Annual Bid - Micro Seal & Slurry Laid-In-Place 2027

Closes 11/3/2026Opened 10/1/2026

Georgia City of Sandy Springs·Georgia

67% match

27-014 Trenchless Stormwater Pipe Rehabilitation Project - 2027

Closes 11/19/2026Opened 10/19/2026

City of Elgin·Illinois

67% match

Chicago Street Combined Sewer Separation Project

Closes 11/10/2026Opened 10/8/2026

City of West Sacramento·California

67% match

Corpyard Phase II - Concrete Ramp Coating

Closes 11/10/2026Opened 10/26/2026

Texas Department of Transportation·Texas

67% match

STATE LET CONSTRUCTION CONTRACT, COLORADO CO, SEAL COAT

Closes 11/4/2026Opened 10/7/2026

City of Tega Cay·South Carolina

67% match

Tega Cay 2026 C-Fund Project

Closes 1/8/2027Opened 10/8/2026

Lake Havasu City·Arizona

67% match

RE-BID FY 2026-2027 CRACK/MASTIC SEAL PROGRAM

Closes 11/23/2026Opened 10/29/2026

City of Albany·Georgia

66% match

Albany Pipe Rehabilitation - Phase I

Closes 11/11/2026Opened 10/8/2026

City of Lincoln·Nebraska

66% match

Chip Sealing 2026 (26-02) (Co. Engineer)

Closes 11/4/2026Opened 10/21/2026

Texas Department of Transportation·Texas

66% match

STATE LET CONSTRUCTION CONTRACT, SHERMAN CO, SEAL COAT

Closes 11/4/2026Opened 10/7/2026

City of Ellsworth·Maine

66% match

Ellsworth City Seal Removal, Stabilization & Assessment

Closes 11/27/2026Opened 9/23/2026

New York City Department of Design and Construction·New York

66% match

Installation of Cold Fluid Applied Reinforced Membrane Roofing System

Rolling / TBD closeOpened 11/12/2024

Massachusetts Town of Southborough·Massachusetts

66% match

2026-2027 Crack Seal Projects

Closes 11/6/2026Opened 10/16/2026

Wabasha County, Minnesota·Minnesota

66% match

Wabasha County 079-274-000 seal coat

Closes 11/18/2026Opened 10/16/2026

City of Redlands·California

66% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

City of West Des Moines·Iowa

66% match

2026 Sewer Pipe Rehabilitation Program

Closes 11/4/2026Opened 10/20/2026