Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›Dona Bay Ph 3 Exploratory Well

Sarasota County·Florida

Dona Bay Ph 3 Exploratory Well

Closes 7/29/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The project involves the construction of a Class V exploratory monitor well RZMW-1 at the Dona Bay Surface Water Storage Facility. The well will be drilled to a depth of 1850 feet below land surface to characterize aquifer permeability and ambient groundwater quality in the Upper Avon Park formation. The contractor will be responsible for furnishing all labor, materials, equipment, and services necessary to complete the work. The project includes the installation of a drill pad, monitor wells, and the construction of a wellhead. The contractor must comply with all applicable laws, regulations, and safety requirements. • The project requires the contractor to drill and test the well to a depth of 1850 feet below land surface. • The contractor must install a drill pad and monitor wells. • The contractor must construct a wellhead and install a blind flange with a two-inch access port and ball valve. • The contractor must perform packer testing to evaluate the hydraulic properties of the well. • The contractor must provide all necessary equipment and personnel to complete the work. • The contractor must comply with all applicable laws, regulations, and safety requirements.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Michael Hicks(Engineer)

[email protected]

(941) 861-0614

Key dates

Opened
6/22/2026
Questions due
7/15/2026
Closes
7/29/2026
Duration
485 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
262878MH

Budget estimate

$500,000 – $2,000,000

The budget for this project is estimated to be between $500,000 and $2,000,000, based on the complexity of the project and the scope of work. The project involves the construction of a well and related infrastructure, which requires specialized equipment and labor. The cost of materials, equipment, and labor will be significant, and the contractor will need to factor in the cost of permits, inspections, and testing. Additionally, the project requires compliance with environmental regulations, which may add to the overall cost.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·California

Top match · 59%

Remedial Investigation (RI) and Optional Feasibility Study (FS) for Per- and Polyfluoroalkyl Substances (PFAS)

Closes 11/30/2026Opened 10/28/2026

U.S. National Science Foundation·United States of America

58% match

Chemical Oceanography

Rolling / TBD closeOpened 3/13/2015

County of Maui·Hawaii

58% match

Groundwater Deep Monitoring Well at Alaeloa Tank Site [Tk104]

Closes 11/13/2026Opened 10/5/2026

St. Lucie County - Purchasing Department·Florida

57% match

Analytical Laboratory Services

Closes 11/4/2026Opened 10/4/2026

Palm Beach County (Board of County Commissioners)·Florida

57% match

PBC North County Shore Protection

Closes 11/18/2026Opened 10/19/2026

City of Cedar Rapids·Iowa

57% match

Phosphoric Acid 75% Bulk Liquid

Closes 11/10/2026Opened 10/27/2026

Town and County of Nantucket·Massachusetts

57% match

Cellular Service Site Assessment and Feasibility Study

Closes 11/4/2026Opened 10/9/2026

Cincinnati/Northern Kentucky International Airport·Kentucky

57% match

Phosphoric Acid

Closes 11/12/2026Opened 10/29/2026

Gilbert·Arizona

57% match

Gilbert Regional P3 Parcel Analysis

Closes 12/2/2026Opened 10/28/2026

U.S. Geological Survey·United States of America

57% match

Cooperative Agreement for affiliated Partner with Northern Great Plains Cooperative Ecosystem Studies Unit

Closes 11/14/2026Opened 10/14/2026

St. Johns County - Purchasing Department·Florida

57% match

South Ponte Vedra Beach Nourishment – FEMA CAT-G Project

Closes 11/6/2026Opened 10/7/2026

Manatee County Port Authority·Florida

57% match

Container Yard Phase 3

Closes 11/20/2026Opened 10/23/2026

City of Seal Beach·California

57% match

San Gabriel River Trash Interceptor Pilot Project - Environmental Review / Permitting Support Services (CIP SD2501)

Closes 11/10/2026Opened 10/6/2026

Tacoma·Washington

57% match

Trilogy Reservoir and Booster Pump Station

Closes 11/10/2026Opened 9/30/2026

Wayne Township·New Jersey

57% match

High Calcium Hydrated Lime Ca(OH)2

Closes 11/13/2026Opened 10/21/2026

Alaska Department of Environmental Conservation·Alaska

57% match

Notice of Categorical Exclusion Determination - Expand Wells 4 and 5, City of Palmer

Rolling / TBD closeOpened 9/22/2026

Hawaii Department of Health·Hawaii

57% match

Laboratory Services for Emerging Contaminants

Closes 11/4/2026Opened 10/15/2026

Los Angeles County Sanitation Districts·California

56% match

ENVIRONMENTAL ANALYTICAL LABORATORY SERVICES

Closes 11/30/2026Opened 10/31/2026

California Grants·California

56% match

Proposition 1 Delta Water Quality and Ecosystem Restoration Grant Program

Rolling / TBD closeOpened 6/18/2025

Sarasota County·Florida

56% match

Physical Map Revision for Little Sarasota Bay, Lemon Bay, and Phillippi Creek Watersheds

Closes 11/19/2026Opened 10/21/2026

Alabama State Port Authority·Alabama

56% match

RFQ/RFP-Upper Mobile Bay Beneficial Use Wetland Creation (Implementation) – Phase 1

Closes 11/6/2026Opened 9/22/2026

City of Corona·California

56% match

City of Corona Electric Utility Battery Energy Storage System Feasibility Study

Closes 11/19/2026Opened 10/5/2026

Town of Eatonville·Florida

56% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

U.S. Department Of Defense·Oregon

56% match

Coos Bay Pier Utilities

Closes 11/23/2026Opened 10/21/2026

County of Maui·Hawaii

56% match

Central Maui Landfill Phase VII Part 1 Ash Disposal Cell Encapsulation Cap, BMPs

Closes 11/13/2026Opened 10/23/2026