The City of Atlanta, in partnership with the PATH Foundation and GDOT, seeks a pre‑qualified consulting team to design a paved shared‑use path linking the Southside Beltline Trail to the Southtowne Trail at South Bend Park. The effort is divided into two phases, with Phase I covering preliminary design, NEPA documentation, stakeholder engagement, and final design deliverables under a three‑year base contract (with a one‑year renewal option). The consultant must be pre‑qualified in multiple GDOT area classes covering roadway, bridge, environmental, utility, and NEPA work, and will be responsible for project management, data collection, traffic analysis, design drawings, cost estimating, environmental review, and public outreach.
• Scope: Concept validation, preliminary and final design plans, NEPA/Environmental documentation, ROW and utility coordination, construction‑ready plans.
• Delivery: Task orders over the contract term; Notice to Proceed Q3 2026, final design Q2 2029, construction plans ready Q1 2030.
• Required qualifications: GDOT pre‑qualification in specific area classes (roadway, bicycle/pedestrian facilities, bridge, erosion control, NEPA, traffic, utility coordination, etc.).
• Team composition: Prime consultant plus sub‑consultants covering engineering, environmental, surveying, and stakeholder engagement.
• Key deliverables: Revised concept report, PFPR & FFPR design packages, NEPA document, ROW plans, construction plans, updated cost estimates, public engagement summary.
• Contract term: 3 years base, 1 year optional renewal; multiple task orders; monthly reporting and invoicing.