The City of Chula Vista is seeking a qualified contractor to execute a multi‑year pavement rehabilitation program covering FY 22/23 through FY 24/25. The work includes full‑depth removal and replacement of asphalt concrete, cold‑milling, AC overlays, rubber‑polymer‑modified slurry seal coats, installation of new PCC sidewalks, curbs, gutters, and curb‑ramps, as well as extensive traffic‑signal, lighting, and traffic‑control upgrades. The scope also encompasses utility‑related conduit work, night‑time and school‑zone restrictions, and compliance with prevailing‑wage and Project‑Labor‑Agreement requirements.
• Remove, dispose, and replace AC pavement (dig‑outs) and perform cold‑milling and AC overlay (≈ 2.9 M SF).
• Install traffic‑signal detection equipment, conduit, street‑light relocations, and related electrical work.
• Construct PCC sidewalks, curb‑ramps (Types A‑D), cross‑gutters, and associated storm‑water BMPs.
• Adhere to 150‑day base schedule (extended to 180 working days) with strict night‑work, school‑zone, and noise‑control provisions.
• Provide 100 % bid‑value material/labor and performance bonds, certified payroll, and use the City’s VPM/PlanetBids electronic platforms.