Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Georgia guideGeorgia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Georgia
  4. ›Construction
  5. ›POOLER PARKWAY AT BENTON BOULEVARD, MILL CREEK CIRCLE, AND…

Georgia City of Pooler·Georgia

POOLER PARKWAY AT BENTON BOULEVARD, MILL CREEK CIRCLE, AND I-95 SOUTHBOUND RAMPS POOLER.

Closes 10/7/2026$2M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Pooler is soliciting sealed bids for the design‑build construction of approximately 3,725 linear feet of roadway, including modifications to a signalized intersection, sidewalk extensions, drainage improvements, and required erosion, sediment and pollution control measures. The contract will be awarded to the responsible bidder offering the best value, with performance and payment bonds required, and a 5 % bid bond. Work must comply with GDOT standards and be completed within 540 calendar days, subject to extensions. • Scope: Roadway construction, signalized intersection modifications, sidewalks, drainage, BMPs, final site stabilization. • Location: Pooler, GA (100 US Hwy 80 SW, Pooler City Hall). • Estimated length: ~3,725 ft of new/rehabilitated roadway. • Mandatory documents: Bid bond (5 %), performance bond, payment bond, certifications, insurance, E‑Verify, drug‑free workplace, etc. • Pre‑bid conference (optional): Sep 16, 2026, 2:00 PM at Pooler City Hall. • Bid submission deadline: Oct 7, 2026, 2:00 PM (sealed bids at City Hall). • Project schedule: Completion required within 540 days; liquidated damages of $1,000 per day for overruns. • Contractor qualifications: Must hold Georgia General Contractor license, appropriate insurance (CGL $1 M, WC $500 K, Auto $1 M), and meet local participation goals. • Contact: Leon Davenport, (912) 644‑0285, [email protected].

Attached files

Contact

Leon Davenport(Buyer Contact)

[email protected]

(912) 644-0285

Key dates

Opened
8/28/2026
Pre-bid meeting
9/16/2026
Closes
10/7/2026
Duration
540 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
PE-66418-NONST-2026-000000023

Budget estimate

$2,000,000 – $5,000,000

No contract value is disclosed. Based on typical municipal roadway projects of roughly 3,700 ft, comparable recent bids in Georgia range from $2 million to $5 million depending on pavement type, utility relocation, and site conditions. Assuming standard two‑lane asphalt with moderate drainage work, a low‑end estimate of $2 M and a high‑end estimate of $5 M are reasonable. Factors influencing the final amount include material prices, subcontractor rates, any unforeseen utility conflicts, and the extent of traffic control measures required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Miramar·Florida

Top match · 64%

Milling and Resurfacing of Miramar Parkway from SW 172 Ave to SW 184 Ave

Closes 11/19/2026Opened 10/22/2026

Maryland Transportation Authority·Maryland

63% match

I-95 / I-695 INTERCHANGE EXPRESS TOLL LANES – RAMPS MB & MH

Closes 1/13/2027Opened 10/10/2025

City of Richmond Government·Virginia

63% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

Illinois Tollway·Illinois

63% match

RR-26-2066 - Roadway & Bridge Rehabilitation & Plaza Improvements

Closes 12/3/2026Opened 10/26/2026

U.S. Department Of Transportation·Mississippi

63% match

Natchez Trace Parkway Project MS NP NATR 3F26

Closes 11/10/2026Opened 10/8/2026

U.S. Department Of Transportation·Colorado

63% match

ND NP THRO 204(1) Buck Hill Road

Closes 11/3/2026Opened 10/1/2026

City of Harrisonburg·Virginia

63% match

Northend Greenway (NEG) Brookside ITB (2027020-PW-B)

Closes 12/10/2026Opened 10/22/2026

City of Charlotte·North Carolina

63% match

Rea Road Widening (I-485 to Williams Pond Lane)

Rolling / TBD closeOpened 3/6/2026

City of Hampton·Virginia

63% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/30/2026

Georgia Wilcox County Board of Commissioners·Georgia

62% match

2026 TIA Road Resurfacing Improvements - Pleasant View Road

Closes 11/5/2026Opened 10/7/2026

Illinois THA - Toll Highway Authority·Illinois

62% match

RR-26-2066 Jane Addams Meml Tlwy I-90 Rdwy and Bridge Rehab and Plaza Impr Rock Cut Pk Rd to Genoa R

Closes 12/3/2026Opened 10/22/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

62% match

DGS 142‑6 PH 1 Park Improvements & DGS 142‑7 PH 1 Stream Corridor Restorations – Ryerson Station State Park

Closes 11/12/2026Opened 10/14/2026

Camden County·New Jersey

62% match

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

62% match

Ryerson Station State Park – Park Improvements and Stream Corridor Restorations

Closes 11/12/2026Opened 10/14/2026

City of Charlotte·North Carolina

62% match

SouthPark Loop - Cameron Valley Parkway

Rolling / TBD closeOpened 1/1/2027

Marion County·South Carolina

62% match

Marion County Paving Project

Closes 11/17/2026Opened 10/22/2026

U.S. Department Of Transportation·North Dakota

62% match

ND NP THRO 204(1) Buck Hill Road

Closes 11/3/2026Opened 10/1/2026

City of Charlotte·North Carolina

62% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

City of Smithville·Missouri

62% match

RFP 26-07 Bridge Street Roundabout Improvements

Closes 11/3/2026Opened 9/29/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

62% match

Ryerson Station State Park – Park Improvements and Stream Corridor Restorations

Closes 11/12/2026Opened 10/14/2026

City of Dayton·Ohio

62% match

Patterson Boulevard Rehabilitation

Closes 11/12/2026Opened 10/29/2026

Massachusetts City of Brockton·Massachusetts

62% match

BID FOR: Intersection Improvements at Two Locations: Pleasant St at Spring St and Main St at Nilsson

Closes 11/19/2026Opened 10/22/2026

City of Charlotte·North Carolina

62% match

Wilkinson Blvd. Intersection Improvements

Rolling / TBD closeOpened 2/8/2027

City of Charlotte·North Carolina

62% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

City of Brandon·Mississippi

62% match

GRANTS FERRY PARKWAY MULTI-USE PATH PHASE 2

Closes 11/13/2026Opened 10/13/2026