Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Ohio guideOhio Bids and Bidding Guide
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Ohio
  4. ›Civil Engineering
  5. ›Pike Lake Water Line Repair Between Cabins 13-15

Ohio Department of Natural Resources·Ohio

Pike Lake Water Line Repair Between Cabins 13-15

Closes 12/23/2025$50k – $200kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Ohio Department of Natural Resources is requesting bids for the repair of a water line between cabins 13-15 at Pike Lake State Park. The project involves bypassing the current trouble area and reconnecting the water line just beyond cabin 15. The new main line pipe material must be either 6” C-900 or 6” HDPE, and the approximate pipe run is 220 feet. The contractor will be responsible for pressure testing, disinfection, and commissioning of the new water line, as well as backfill, bedding material, gravel, or asphalt. The area must be remediated to pre-construction conditions within the discussed timeline with park management. • The contract will be awarded to the lowest responsive and responsible bidder as determined by the State. • The State will apply all preferences pursuant to Ohio Administrative Code 123:5-1-06. • The contractor must provide Deliverables under this Contract F.O.B. Destination/Pre-Paid/Allowed. • All equipment used on-site shall be free of sediment and debris from off-site to minimize the introduction of invasive species.

Attached files

Contact

Matt Lewis or Nate Gray

(937) 402-0184 or (937) 402-0178

Key dates

Opened
12/8/2025
Questions due
12/18/2025
Closes
12/23/2025
Duration
49 days

Last updated

Details

Type
Request for Quotation
Industry
Civil Engineering
NAICS
237110
Solicitation №
SRC0000035719

Budget estimate

$50,000 – $200,000

The budget for this project can be estimated based on the scope of work and the materials required. The project involves the repair of a 220-foot water line, which may require significant labor and materials costs. The cost of the materials, including the new main line pipe, valves, and fittings, could be substantial. Additionally, the cost of labor, equipment, and other expenses such as backfill, bedding material, gravel, or asphalt, and remediation of the area to pre-construction conditions, should be considered. Based on these factors, a rough estimate for the budget could be between $50,000 and $200,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Lake City and City of Bellechester·Minnesota

Top match · 68%

Lake City & Bellechester Lead Service Line Replacement Project

Closes 12/8/2026Opened 10/16/2026

Minnesota Department of Administration·Minnesota

67% match

Douglas Lodge Area Water & Sewer Replacement

Closes 11/19/2026Opened 10/15/2026

City of Augusta, GA (Augusta Commission)·Georgia

66% match

Cook Road Waterline Replacement

Closes 11/30/2026Opened 10/29/2026

Alabama Bill Nichols State Veterans Home·Alabama

66% match

Nichols Hot Water Line Repair

Closes 11/5/2026Opened 10/28/2026

City of Columbus Ohio·Ohio

65% match

OSU Innovation District Waterline Extension

Closes 11/18/2026Opened 10/26/2026

Gwinnett County Government·Georgia

65% match

Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

Kenosha County·Wisconsin

65% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Georgia Fayette County Board of Commissioners (Purchasing Department)·Georgia

65% match

27043-B: Lake McIntosh Dam Structural Repairs

Closes 11/19/2026Opened 10/13/2026

Montgomery County OH·Ohio

65% match

Water Main Repair Services Price Agreement

Closes 11/4/2026Opened 10/9/2026

NYS Harrietstown Housing Authority·New York

65% match

Lake Flower Apartments, Infrastructure Upgrades

Closes 11/20/2026Opened 8/24/2026

The City of Columbus·Ohio

64% match

RFQ033929 - OSU Innovation District Waterline Extension 690236-100174

Closes 11/18/2026Opened 10/26/2026

Miami-Dade County·Florida

64% match

Multiple Marina Construction and Repairs - North of Tamiami Trail to the County line

Closes 11/10/2026Opened 10/22/2026

U.S. Department Of Defense·Missouri

64% match

Water and Electrical Utility Lines, Minooka Park C Loop Campground at Wilson Lake, Kansas

Closes 7/8/2027Opened 5/21/2026

City of Green Bay·Wisconsin

64% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

City of Waukegan·Illinois

64% match

O'Plaine Road and I-94 Tollway Water Main Rehabilitation

Closes 11/3/2026Opened 10/22/2026

Greenville County·South Carolina

64% match

Pleasant Ridge Flooring Repair & Waterproofing

Closes 12/7/2026Opened 10/30/2026

City of Cortez·Colorado

64% match

2027 Raw Waterline Inspection Project

Closes 12/15/2026Opened 10/28/2026

North Carolina City of Asheville·North Carolina

64% match

Water Line Repair for Wood Ave and Misc. Insulation Replacement

Closes 11/5/2026Opened 10/1/2026