Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Construction
  5. ›2026 Palmview Street Improvements

Hidalgo County·Texas

2026 Palmview Street Improvements

Closes 8/12/2026$500k – $2M
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The 2025 Palmview Street Improvements project involves street paving (overlay) and full reconstruction of streets, including adjacent/abutting streets within the same general vicinity. The project includes the installation of temporary erosion, sediment, and water pollution control measures, as well as the construction of rock filter dams and sediment control fences. The project also involves the placement of traffic control devices, including signs, barricades, and channelizing devices. • The project requires the installation of temporary erosion, sediment, and water pollution control measures. • The project involves the construction of rock filter dams and sediment control fences. • The project requires the placement of traffic control devices, including signs, barricades, and channelizing devices. • The project involves the reconstruction of streets, including adjacent/abutting streets within the same general vicinity.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Eloisa Pena

[email protected]

(956) 787-8127 Ext: 2235

Key dates

Opened
7/25/2026
Questions due
8/6/2026
Closes
8/12/2026

Last updated

Details

Industry
Construction
NAICS
237310
Solicitation №
5025-55-0311-5000-00

Budget estimate

$500,000 – $2,000,000

The budget for this project can be estimated based on the scope of work, which includes street paving, reconstruction, and the installation of temporary erosion, sediment, and water pollution control measures. The cost of materials, labor, and equipment will be significant factors in determining the budget. Assuming a moderate-sized project with a scope of work similar to what is described, a rough estimate for the budget could be between $500,000 and $2,000,000. However, this is a very rough estimate and the actual budget could be higher or lower depending on various factors, including the specific requirements of the project, the location, and the contractor's experience and expertise.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Florida School for the Deaf and the Blind (FSDB)·Florida

Top match · 68%

PUBLIC ANNOUNCEMENT FOR PALM ROW ROADWAY IMPROVEMENTS-RFP-27-063

Closes 11/6/2026Opened 9/25/2026

Village of Glenview·Illinois

67% match

Crabtree Ln, Linneman St, Virginia Ln Roadway & Utility Improvements

Closes 11/12/2026Opened 10/29/2026

City of Johnson·Arkansas

66% match

City Street Overlay and Striping Improvements

Closes 11/5/2026Opened 10/18/2026

City of San Clemente·California

66% match

FY 2027 Arterial Street Improvement

Closes 11/5/2026Opened 10/15/2026

Georgia City of College Park·Georgia

66% match

MAIN STREET STREETSCAPE IMPROVEMENTS

Closes 11/10/2026Opened 10/28/2026

City of Maple Grove·Minnesota

66% match

26-02 - Patrick's Ridge and Rush Creek Villas Area Street Rehab

Closes 2/1/2027Opened 12/2/2025

Ohio City of Westerville·Ohio

66% match

Brooksedge Area Mobility Improvements, PH 2 & 3

Closes 11/4/2026Opened 10/7/2026

Texas City of San Antonio·Texas

66% match

2027 Street Rehabilitation Package 7 – Overlay

Closes 12/15/2026Opened 10/28/2026

City of Palm Springs·California

66% match

East Palm Canyon Bridge Project

Closes 11/20/2026Opened 10/20/2026

Virginia Department of Transportation·Virginia

66% match

B38_2027 SMART SCALE - ROADWAY AND PEDESTRIAN IMPROVEMENTS

Closes 12/15/2026Opened 10/27/2026

City of Indianapolis·Indiana

66% match

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/9/2026

City of San Antonio·Texas

65% match

RFCSP 2026-118 Main Plaza Renovations

Closes 12/1/2026Opened 10/16/2026

Georgia Wilcox County Board of Commissioners·Georgia

65% match

2026 TIA Road Resurfacing Improvements - Pleasant View Road

Closes 11/5/2026Opened 10/7/2026

Texas City of San Antonio·Texas

65% match

2027 Street Rehabilitation Package 6 - Overlay

Closes 12/11/2026Opened 10/28/2026

Virginia Department of Transportation·Virginia

65% match

B36_2027 PEDESTRIAN SAFETY IMPROVEMENTS

Closes 11/18/2026Opened 10/13/2026

City of Broken Arrow·Oklahoma

65% match

Dallas Street Rehabilitation:

Closes 11/17/2026Opened 9/29/2026

Alaska Department of Transportation and Public Facilities (DOT&PF)·Alaska

65% match

PUBLIC NOTICE: 2024–2027 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) AMENDMENT NO. 6 APPROVED

Rolling / TBD closeOpened 9/22/2026

City of Hermosa Beach·California

65% match

CIP 106 - Annual Street Improvements Project

Closes 12/9/2026Opened 10/29/2026

LA Public Works Engineering Bureau·California

65% match

AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)

Closes 11/4/2026Opened 9/30/2026