The Parish of St. Tammany is seeking a qualified contractor to improve drainage in the Wildwood Farms Subdivision, Pearl River, LA, by replacing driveway pipes, catch basins, and storm‑drain piping along Max Mercer Rd and Cecil Fleming Rd. The work includes mobilization, temporary traffic control, removal and replacement of 18‑, 24‑, and 30‑inch high‑pressure storm‑drain pipe, cross‑drain pipe installation, full‑depth asphalt patching, concrete driveway replacement, slab sodding, rip‑rap installation, and related site grading. The contractor must supply all labor, equipment, materials, and permits, hold the required Louisiana highway/street/bridge construction license (if contract ≥ $50 k), and provide the required insurance and performance bond. The contract will be awarded to the lowest responsive bid, with a 45‑day completion window from notice‑to‑proceed.
• Scope includes storm‑drain pipe replacement (≈ 260 ft total) and associated civil works.
• Required licenses, insurance, performance bond, and retainage (5‑10 %).
• Fixed deadlines: bid submission by 11 Dec 2026 03:00 PM EST; work must be completed within 45 calendar days after NTP.