The City of Danville is seeking a qualified contractor to replace the traffic signal at Broad Street and install a new overhead sign structure on the exit ramp to Southbound Memorial Drive as part of the Central Boulevard Improvement project. The work includes removal of existing signal hardware, installation of new signal heads, controllers, wiring, and a structurally sound overhead sign support. The contractor must comply with local, state, and federal traffic safety standards, coordinate with city traffic management, and complete the work within the contract period. The bid was posted on 9/18/2026 and closes on 9/28/2026. The award has already been notified to J.B. Moore Electrical Contractor, Inc. • Replace existing traffic signal at Broad St. • Install new overhead sign structure on exit ramp • Provide all materials, labor, and engineering coordination • Meet all applicable safety and construction codes • Complete work within the stipulated contract timeframe.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.